
PB-74/7500
- 3 -
PRE-DELIVERY & DELIVERY CHECK LIST
This Pre-Delivery & Delivery Check List must be gone through by the Selling Party and the Customer to
validate the Owner’s Registration Form.
Meyer Manufacturing Corporation
Phone: 715-654-5132 • Toll-Free: 1-800-325-9103 • P.O. Box 405 • Dorchester, WI 54425
Spreader Check List
All shields and guards are in place and securely
fastened.
All bolts and other fasteners are secure and tight.
All mechanisms operate trouble free.
All grease fittings have been lubricated, gear
boxes filled to proper levels, and all roller chains
are oiled. See “Lubrication” section of this
manual.
PTO shields turn freely.
All roller chain springs adjusted properly for
automatic tensioning. See “Adjustments” section
in this manual.
Both LR and RR Spinner Material Guides are
adjusted properly. See “Adjustments” section in
this manual.
All decals are in place and legible.
All stop/tail/turn lights work properly.
PRE-DELIVERY CHECK LIST
After the New Meyer Spreader has been completely
set-up, check to be certain it is in correct running order
before delivering it to the customer.
The following is a list of points to inspect:
Check off each item as you have made the proper
adjustments and found the item operating
satisfactorily. Any adjustments made, MUST be
according to specifications defined in this manual.
DELIVERY CHECK LIST
The following check list is an important reminder of
valuable information that MUST be passed on to the
customer at the time the unit is delivered.
Check off each item as you explain it to the
customer.
Explain to the customer that pre-delivery check
list was fully completed.
Give customer the Owner & Operator’s Manual.
Instruct to read and completely understand its
contents BEFORE attempting to operate the
spreader.
Explain and review with customer the New Meyer
Spreader manufacturer’s warranty.
Show the customer where to find the serial
number on the implement.
Explain and review with the customer “Safety
Precautions” section of this manual.
Explain and review with customer the proper
“Start-up and Operating Procedures” sections of
this manual.
Demonstrate the PTO Shaft Locking Device and
proper PTO shaft storage. Also, demonstrate
proper hydraulic hose storage and tip holder used
to keep system clean from contaminants.
Explain that regular lubrication and proper
adjustments are required for continued proper
operation and long life of the spreader. Review
with the customer the “Lubrication” and
“Adjustments” sections of this manual.
Explain and review with customer the
recommended loading and unloading procedures
for different types of manure.
Also, demonstrate the manual operation of the
Trip Pan Doors (V-Max only) and proper way to
adjust the Rear Spinner Material Guides.
Fully complete this “PRE-DELIVERY &
DELIVERY CHECK LIST” with the customer.
Summary of Contents for V-FORCE 7400 Series
Page 30: ...PB 74 7500 30 REPAIR PARTS FRONT SHIELD SIDE SHAFT DRIVE...
Page 32: ...PB 74 7500 32 AUGER DRIVE PRIMARY REDUCTION...
Page 35: ...PB 74 7500 35 This Page Intentionally Blank...
Page 40: ...PB 74 7500 40 BOX AUGERS SIDE SHAFT...
Page 42: ...PB 74 7500 42 7400 7500 UNLOADING GATE MATERIAL GUIDES 7500 PRIOR TO 2011 MODEL YEAR...
Page 44: ...PB 74 7500 44 7400 7500 UNLOADING GATE MATERIAL GUIDES CONT D 7500 PRIOR TO 2011 MODEL YEAR...
Page 46: ...PB 74 7500 46 7500 UNLOADING GATE MATERIAL GUIDES 2011 MODEL YEAR LATER...
Page 48: ...PB 74 7500 48 SPINNERS GEARBOX SHAFT DRIVE...
Page 53: ...PB 74 7500 53 This Page Intentionally Blank...
Page 54: ...PB 74 7500 54 HUBS AXLE TANDEM AXLE ASSEMBLY...
Page 56: ...PB 74 7500 56 THIRD AUGER...
Page 58: ...PB 74 7500 58 OIL KIT...
Page 60: ...PB 74 7500 60 V FORCE LIGHTING...
Page 71: ...PB 74 7500 71 This Page Intentionally Blank...
Page 75: ...PB 74 7500 75 This Page Intentionally Blank...
Page 84: ...PB 74 7500 84 This Page Intentionally Blank...
Page 85: ...NOTES...
Page 86: ...NOTES...