Summary of Contents for MGC-F

Page 1: ...MEVA Guided Climber Foldable MGC F Technical Instruction Manual May 2022...

Page 2: ...cal formwork and the work platform are a single unit Thanks to the guiding profiles remains securely attached to the building structure during building and lifting Thus wind velocities do not affect t...

Page 3: ...covered in this manual please contact the MEVA experts for advice When using our products the federal state and local codes or regulations must be observed Many of the details shown do not illustrate...

Page 4: ...extension 4 MGC Climbing Shoe w Swivel Guide 5 Access hatch KLK 6 Ledger MGC 7 Scaffold tube with Bolt on couplers Swivel Joint couplers 8 Guiding profile extension MGC 9 Ladder system consisting of L...

Page 5: ...nut M16 Tension rod extension 4 MGC Climbing Shoe w Swivel Guide 5 Access hatch KLK NOT VISIBLE 6 Ledger MGC 7 Scaffold tube with Bolt on couplers Swivel Joint coupler 8 Guiding profile extension MGC...

Page 6: ...cess hatch KLK 7 Support planks around opening for access hatch 8 Climbing shoe Secondary platform 1 2x4 Guard railing 2 Railing Clamp 42 3 Secondary Platform Folding Bracket 4 2x4 on flat at 24 max c...

Page 7: ...stened If this cannot be achieved platforms and forms should be removed from walls and secured on the ground If a hurricane is predicted all material must be removed from the walls and the formwork an...

Page 8: ...he climbing cones at all openings and near edges The minimum distances shown apply when using the MGC climbing brackets with a maximum load The minimum distances can be reduced if the load is lower In...

Page 9: ...atory Inaccurately placed anchors or anchors that have moved during concreting MUST NOT BE USED Hexagonal screw M24 60 Fig 9 4 Fig 9 3 Positioning disc M24 1 Screw the M24x60 bolt through the pre dril...

Page 10: ...have a minimum height of 10 6 The heights of the subsequent cycles determine the lengths of the guiding profile extensions Fig 10 2 Fig 10 1 Minimum height for the first and second pouring cycle depe...

Page 11: ...ion to be swivelled in Climbing shoe MGC The pour 2 climbing shoe MGC can be rigid or swivel see fig 11 2 Reference Ref No Climbing shoe MGC 29 011 50 Climbing shoe MGC with swivel guide 29 011 60 Gui...

Page 12: ...uired and attached at position on guiding profile expensions Always check for an accurate position of the ledgers at the guiding profile extensions Guiding profile extensions 80 and 55 usually do not...

Page 13: ...1 x 332 352 x x 1 x 332 362 x x 2 x 342 352 x x x 342 372 x x 2 x 352 362 x x x 352 382 x x 2 x 362 372 x x x 362 382 x x 1 x 372 392 x x 1 x 382 402 x x 1 x 382 412 x x 2 x 392 422 x x 2 x 402 432 x...

Page 14: ...he planking The access hatch is positioned between the platform s stringers and the slide carriages It must be located 39 5 minimum behind the edge of the guiding profile to make sure that the hatch c...

Page 15: ...70 29 416 52 7 Ladder fixture 130 29 416 68 8 Ladder link set 29 414 72 9 Extension ladder 210 29 416 60 10 Safety cage 85 29 414 90 11 Ladder fixture railing 29 416 69 12 Coupling pin 48 LAB 29 421 9...

Page 16: ...2 2 2 Ladder fixture railing 29 416 69 1 1 1 1 1 1 1 1 1 1 1 1 Safety cage 210 29 414 85 1 1 2 2 2 2 2 2 2 2 3 3 Safety cage 85 29 414 90 2 2 1 1 1 2 2 2 Safety cage 40 29 416 90 1 1 Ladder configurat...

Page 17: ...rial is on that platform All loose parts and tools must be removed from the platform prior to lifting it We recommend using 4 rope crane slings when crane lifting platforms one or more You can use a c...

Page 18: ...d Yellow 230 RH Silver Head Green 280 RH Silver Step 2 Place two 2 aluminum stringers on MGC Once proper cantilever is established attach with one 1 beam clamp per crossing After clamps are tightened...

Page 19: ...Guiding Profile MGC Step 6 Remove 2 pins per lower starter shoes to allow swivel guides to open Fly the pre asssembled MGC foldable platform up to the shoes and rest the safety catch to the upper sta...

Page 20: ...yes Step 8 Remove bottom pin connecting horizontal wailer MGC w slide carriage guiding profile MGC Begin slowly lifting the bottom end of the horiz wailer upwards into the horizontal position Be sure...

Page 21: ...rds by attaching a four way sling to each of the available crane eyes on the horizontal wailer MGC Step 9 Once the horizontal wailer is in the horizontal position place 2 post shores with forked prop...

Page 22: ...rotective equipment must be worn at all times that protects you from falling You can ascend to and descend from the MGC platform as follows through the building s existing wall openings for doors or w...

Page 23: ...e climbing shoes MGC that still remain in the wall must not be removed using the disengaged climbing unit Remove them using a OSHA approved workman basket or safety cage Fig 23 2 Important note When w...

Page 24: ...us Since MEVA started the flat rate for cleaning and repair of rented formwork systems in early 2000 more and more contractors experience the outstanding advantages Ask our representatives about the d...

Page 25: ...Notes...

Page 26: ...Notes...

Page 27: ...Notes...

Page 28: ...Notes...

Page 29: ...Notes...

Page 30: ...204236 F Sarreguemines Tel 33 387 959938 GB Tamworth Tel 44 1827 60217 H Budapest Tel 36 1 2722222 IND Mumbai Tel 91 22 27563430 MAL Perak Tel 60 12 5209337 N Oslo Tel 47 67 154200 PA Panama City 507...

Reviews: