![Metz Eta Plus ELC N10 Technical Documentation Manual Download Page 14](http://html.mh-extra.com/html/metz/eta-plus-elc-n10/eta-plus-elc-n10_technical-documentation-manual_1781299014.webp)
3 Installation
page
11
ELC N6_N10-V3.1-09/11-GB subject to technical alterations
•
Do not twist wires additionally
•
Insert wires into the contact chamber so that the insulation is aligned with the tightening
nut.
•
When tightening the nut hold the wire in position.
Torque: 1Nm (permissible moment für screw
driver =1.2 Nm)
Hexagon socket (jaw span 2)
•
Connect grounding conductor (if applied)
•
Screw on hood. Recommended orientation:
Cable gland in the direction of PIN1 (see
picture below)
•
Ensure that the shield evenly covers the
plastic inset of the cable gland (360°
contact)