4-5
4.3
Signal Processor Board Removal & Installation
4.3.1
Signal Processor Board Removal
4.3.1.1
Open the Case and remove Optics Bench from
case assembly. (Follow steps 4.1.1 Optics
Bench Removal)
4.3.1.2
Disconnect J1 Ribbon cable from signal
processor board J1 connector. (Figure 4.3-2)
4.3.1.3
Remove four Phillips head screws securing
signal processor board from Optics bench
assembly. (Figure 4.3-2)
J1 Ribbon
Connector
Short Philips
Screw
Long Philips
Screw
Short Philips
Screw
Long Philips
Screw
Ground
Wire
FIGURE 4.3-2 OPTICS BENCH ASSEMB LY SHOWING SIGNAL PROCESSOR
BOARD
FIGURE 4.3-1 SIGNAL
PROCESSOR BOARD
Summary of Contents for Cubit IS6520 Series
Page 1: ...I Service Manual METROLOGIC INSTRUMENTS INC MS6520 Cubit Series ...
Page 13: ...3 4 3 2 3 FAR DEPTH OF FIELD ...
Page 41: ...8 4 ...
Page 44: ...8 7 Notes ...
Page 45: ...8 8 Notes ...
Page 46: ...8 9 Notes ...