![Metrohm Dialysis 6.5330.100 Instruction Manual Download Page 14](http://html1.mh-extra.com/html/metrohm/dialysis-6-5330-100/dialysis-6-5330-100_instruction-manual_1779676014.webp)
3.1 Preparing the dialysis cell
■■■■■■■■■■■■■■■■■■■■■■
8
■■■■■■■■
IC equipment Dialysis 6.5330.100
3 Installation
This chapter describes the assembly and connection of the dialysis cell and
the conditioning of the dialysis system.
Depending on the ion chromatograph, the dialysis cell may be placed at
different locations. Please observe the following recommendations:
■
If you are working with an ion chromatograph that has a peristaltic
pump and a cell holder, then place the dialysis cell in the cell holder.
■
If you are working with an ion chromatograph that has a peristaltic
pump but no cell holder, then place the dialysis cell holder
(6.2057.130) in the detector chamber of your ion chromatograph.
3.1
Preparing the dialysis cell
Required tools
■
Dialysis cell
– Dialysis cell (6.2729.100)*
– Low Volume dialysis cell (6.2729.200)**
■
Dialysis membrane (6.2714.010)
■
Hex key (6.2621.070)
■
Tweezers (6.2831.010)
1 Removing the stoppers
■
Remove the four green stoppers.
■
Turn the dialysis cell around and place it on a table.
The screws face upwards.
Summary of Contents for Dialysis 6.5330.100
Page 2: ......