Metrohm 793 IC Instructions For Use Manual Download Page 25

 2.4

2.4

2.4

2.4  Connection

Connection

Connection

Connection    to

to

to

to    aaaa    Modular

Modular

Modular

Modular    IC

IC

IC

IC    System

System

System

System for Cation Elimination 

793 IC Sample Prep Module/ 8.793.1003 Instructions for Use 

21

 

7    SP Module A connection 3:  H

2

x

Pull the inlet capillary 

28

28

28

28

 marked with “H

2

O“ at SP Module A 

connection 

22

22

22

22

 (see 

Fig. 6

) through one of the rear panel 

openings 

41

41

41

41

 or 

43

43

43

43

 of the 733 IC Separation Center. 

x

Mount a PEEK compression fitting 

31

31

31

31

 (6.2744.010) on the 

end of inlet capillary 

28

28

28

28

 and screw this on to the second 

PEEK filter unit 

36

36

36

36

 (6.2821.100) (see 

Fig. 7

). 

x

Mount coupling 

35

35

35

35

 on to the inlet of the PEEK filter unit and 

push this coupling on to outlet end of the second pump 

tubing 

33

33

33

33

 (see 

Fig. 7

). 

x

Mount suction tubing: cut a piece of PTFE Tubing 

30

30

30

30

 

(6.1803.020) to the desired length. 

x

Mount a PEEK compression fitting 

31

31

31

31

 (6.2744.010) on one 

end of PTFE tubing 

30

30

30

30

 and screw this on to coupling 

32

32

32

32

.. 

x

Push coupling 

32

32

32

32

 on to the inlet end of the second pump 

tubing 

33

33

33

33

 (see 

Fig. 7

). 

x

Immerse the other end of the suction tubing in a vessel con-

taining rinsing solution (normally dist. H

2

O) and fix in place. 

x

Pull outlet capillary 

27

27

27

27

 marked with “Waste“ at SP Module A 

connection 

22

22

22

22

 (see 

Fig. 6

) through one of the rear panel 

openings 

41

41

41

41

 or 

43

43

43

43

 of the IC Separation Center 733. 

x

Lead outlet capillary 

27

27

27

27

 to a sufficiently large waste container 

and fix in place. 

8    Startup of 793 IC Sample Prep Module 

x

Set switch <REMOTE> 

2222

 to "OFF". 

x

Switch on 793 IC Sample Prep Module with mains switch 

13

13

13

13

 

and set switch <PUMP> 

3333

 to "ON". 

x

Adjust the contact pressure for both tubing cartridges: press 

contact pressure lever 

5555

 upwards until the solutions just start 

to be drawn in. Then press the contact pressure lever 

upwards until it clicks once more to obtain optimal contact 

pressure. 

x

Check all tubing from the storage vessels through the tubing 

cartridges and the SP Module A up to the waste containers 

for leakage of liquids. If liquid escapes anywhere the 

corresponding compression fitting must be tightened further 

or changed. 

x

Before using the SP Module A for sample pretreatment, its 

cation exchange material should be conditioned. Inject 30% 

sodium hydroxide 15 times (five injections per unit) using the 

sample program of the system “Neutralization” as described 

in the following section. The run time can be 20 min. each 

while the separation column doesn’t have to be installed. 

 

 

Pump tubings are consumable material with a lifetime which depends 

on the contact pressure. This is why the tubing cartridges should be 

raised completely by loosening snap-action lever 

10

10

10

10

 on the right-hand 

side if the pump is to remain switched off for a considerable length of 

time (the set contact pressure remains unchanged). 

Summary of Contents for 793 IC

Page 1: ...e Prep Module IC Sample Prep Module 793 Metrohm ON ON OFF OFF REMOTE PUMP POWER ON OFF REMOTE STEP ACTUATOR Instructions for Use 8 793 1003 CH 9101 Herisau Schweiz E Mail info metrohm com Internet www...

Page 2: ...CH 9101 Herisau Switzerland E Mail info metrohm com Internet www metrohm com 793 IC Sample Prep Module Instructions for Use 8 793 1003 06 2001 up...

Page 3: ...Connection to a Modular IC System for Neutralization 10 2 3 1 Electrical connection 10 2 3 2 Connection of the SP Module A 11 2 3 3 Settings in the IC Net 2 1 program 16 2 4 Connection to a Modular I...

Page 4: ...tion 44 5 5 Index 45 List of figures Fig 1 Front of the 793 IC Sample Prep Module 2 Fig 2 Rear of the 793 IC Sample Prep Module 3 Fig 3 SP Module A 1 793 0110 4 Fig 4 Setting the mains voltage 9 Fig 5...

Page 5: ...ormally used for cation exchanger re generation of the SP Module A instead of sulphuric acid At the control unit the SP Module A can either be switched to the next position manually or by remote contr...

Page 6: ...ition 2 2 2 2 Pump Remote ON OFF On Off switch for remote control of the pump 8 8 8 8 Actuator step Switches the actuator to the next position manual operation mode 3 3 3 3 Pump ON OFF On Off switch f...

Page 7: ...17 17 18 18 18 18 S Fig 2 Rear of the 793 IC Sample Prep Module 13 13 13 13 Mains switch For switching the instrument on off I ON 0 OFF 17 17 17 17 Connection for SP Module A 14 14 14 14 Serial number...

Page 8: ...ents The Instructions for Use are organized as follows Section 1 Introduction General description of instruments parts and controls and safety notes Section 2 Installation Setting up mains connection...

Page 9: ...t 732 IC Detector PARAM detector range 1 00 mS cm Display Text in display 1 1 1 1 of the 732 IC Detector Hazard This symbol draws attention to a possible danger to life or of injury if the associated...

Page 10: ...ains cable is disconnected from mains connection 19 19 19 19 x Protection against static charges Electronic components are sensitive to static charging and can be destroyed by discharges Before you to...

Page 11: ...ether the shipment is complete and has arrived without damage compare with delivery note and list of accessories in section 5 2 In the case of transport damage see instructions in section 5 4 1 Warran...

Page 12: ...le Preparation Module 2 Remove fuse holder Using a screwdriver loosen fuse holder 20 20 20 20 below the mains connection 19 19 19 19 and take out completely 3 Check fuse Carefully take the fuse instal...

Page 13: ...with one of three mains cables x 6 2122 020 with plug SEV 12 Switzerland x 6 2122 040 with plug CEE 7 VII Germany x 6 2133 070 with plug NEMA 5 15 USA which are three cored and fitted with a plug with...

Page 14: ...enhanced by the 793 IC Sample Prep Module If the sample doesn t require matrix elimination and preconcentration it can be treated directly by the SP Module A This could be an option for samples contai...

Page 15: ...Center and connected to the 793 IC Sample Prep Module Addi tionally the suppressor block of the 753 Suppressor Module is inserted and connected which is described in detail in the corresponding 8 753...

Page 16: ...ry 24 24 24 24 marked with Sample in at SP Module A connection 22 22 22 22 see Fig 6 onto connection 5 of injection valve B using a 6 2744 010 compression fitting 4 Connect SP Module A to valve A Prec...

Page 17: ...x Place the tubing cartridges on mounting pin 12 12 12 12 and press down on the right hand side until snap action lever 10 10 10 10 clicks into position on holding clamp 9 9 9 9 Take care that no kink...

Page 18: ...43 43 43 43 of the 733 IC Separation Center x Lead outlet capillary 26 26 26 26 to a sufficiently large waste container and fix in place 7 SP Module A connection 3 H2O x Pull the inlet capillary 28 28...

Page 19: ...le A up to the waste containers for leakage of liquids If liquid escapes anywhere the corre sponding compression fitting must be tightened further or changed x Before using the SP Module A for sample...

Page 20: ...m is activated measuring baseline For this the option Start pump with startup Start pump with startup Start pump with startup Start pump with startup hardware hardware hardware hardware has to be sele...

Page 21: ...SP Module A to next position Rinsing time Switch SP Module A to next position Rinsing time end neutralization smt 5 Save the program for start neutralization smt under a new name end neutralization sm...

Page 22: ...ule If you are not sure about the required capacity for complete cation elimination and or if the sample requires matrix elimination and precon centration in combination with cation elimination by the...

Page 23: ...cted up Proceed as follows 1 Insert SP Module A x Place SP Module A 21 21 21 21 on the floor of the inner chamber of the 733 Separation Center 2 Connect SP Module A x Remove the plastic stopper from o...

Page 24: ...e inlet capillary 25 25 25 25 marked with Regenerant at SP Module A connection 22 22 22 22 see Fig 6 through one of the rear panel openings 41 41 41 41 or 43 43 43 43 of the 733 IC Separation Center x...

Page 25: ...ig 6 through one of the rear panel openings 41 41 41 41 or 43 43 43 43 of the IC Separation Center 733 x Lead outlet capillary 27 27 27 27 to a sufficiently large waste container and fix in place 8 St...

Page 26: ...793 IC Sample Prep Module are started when the IC system is activated measuring baseline For this the option Start pump with startup hardware Start pump with startup hardware Start pump with startup h...

Page 27: ...rect connections The three inlets and outlets numbered 1 3 on the SP Module A each have 2 permanently mounted PTFE capillaries which must be con nected as described in sections 2 3 2 or 2 4 2 respecti...

Page 28: ...ON OFF REMOTE In order to allow manual operation the remote control of the pump must be switched off with switch 2 2 2 2 ON Remote control switched on OFF Remote control switched off Switch pump on of...

Page 29: ...r lamp 1 1 1 1 lights up to show that the instrument is ready for use Switch on remote control of the pump ON OFF REMOTE In order to allow remote operation via 732 IC Detector the remote control must...

Page 30: ...osition via the 732 IC Detector the remote control of the SP Module A must be switched on with switch 6 6 6 6 ON Remote control switched on OFF Remote control switched off Rotate SP Module A in a prog...

Page 31: ...ead 2 to 1 on active 0 V This lead must later be returned to the setting 0 off inactive open before the SP Module A can be switched to the next position Rotate EVENT YY MM DD HH MM SS remote 1 Reset o...

Page 32: ...EEK x Blocked connections x SP Module A blocked x Set contact pressure correctly Press contact pressure lever 5 5 5 5 on the tubing cartridge down as far as it will go Press contact pressure lever 5 5...

Page 33: ...range must be readjusted see below x Readjust braking range see section 4 2 8 Actuator is not switched to next position display lamp 7 7 7 7 no longer lights up x Connection to SP Module A is interru...

Page 34: ...t must not be opened by untrained personnel Please comply with the safety notes in section 1 4 1 4 2 2 Maintenance by Metrohm service Maintenance of the 793 IC Sample Prep Module is best done as part...

Page 35: ...as follows 1 Remove old pump tubing x Press contact pressure lever 5 5 5 5 on the tubing cartridge down as far as it will go x Release tubing cartridge 4 4 4 4 from holding clamp 9 9 9 9 by pressing...

Page 36: ...le A from IC system 2 Regenerate cation exchange material x Rinse all 3 actuator units one after another for about 10 min with one of the following solutions For heavy metal contamination 0 2 mol L HC...

Page 37: ...r rotor 3 Clean input and output leads x Each of the 6 capillary tubings attached to connection piece are connected to the pump one after another and ultrapure water pumped through x Check whether sol...

Page 38: ...38 with the aid of a lint free cloth and ethanol 7 Insert connection piece x Insert connection piece in actuator holder 40 40 40 40 in such a way that connection 1 is at the top and that the three lu...

Page 39: ...ormally stick together x Loosen connection piece from actuator rotor 3 Clean actuator rotor x Clean the sealing surface of new actuator rotor 6 2835 000 with the aid of a lint free cloth and ethanol 4...

Page 40: ...ustment screw 18 18 18 18 Breakpoint t on the rear panel of the 793 IC Sample Prep Module Proceed as follows 1 Condition the cation exchange material x If the actuator has been cleaned or exchanged th...

Page 41: ...x Operate key 8 8 8 8 STEP x Check the position of the rotor in all of the 3 possible posi tions according to Fig 10 x Repeat the adjustment procedure until the position of the rotor lies in the acce...

Page 42: ...s Pump tubing material PVC Tygon Remote interface for pump Purpose Remote control of pump switching on off Pin assignment 330 5V 2 5 Pin Remote interface for SP module A Purpose Remote control of actu...

Page 43: ...ions The Instructions for Use include information and warnings to which the user must pay attention in order to assure safe operation of the instrument Electromagnetic compatibility EMC Emitted interf...

Page 44: ...1 6 2122 0X0 Mains cable to customer s specifications Cable socket Cable connector Type IEC 320 C 13 Type SEV 12 CH 6 2122 020 Type IEC 320 C 13 Type CEE 7 VII D 6 2122 040 Type CEE 22 V Type NEMA 5 1...

Page 45: ...821 110 Filter 1 8 793 1003 Instructions for use English for 793 IC Sample Prep Module 5 3 Optional accessories Order No Description 6 2125 090 Cable RS232 extension cable 1 1 with spezial shielding 6...

Page 46: ...design as well as the absence of guaranteed features the purchaser has no rights or claims except those mentioned above If damage of the packaging is evident on receipt of a consignment or if the goo...

Page 47: ...WG Source of the specifications EN 50081 1 Electromagnetic compatibility basic specification Emitted Interference EN 50082 2 Electromagnetic compatibility basic specification Interference Immunity EN...

Page 48: ...nstrument has been built and has undergone final type testing according to the standards IEC801 2 IEC1000 4 2 level 4 IEC801 4 IEC1000 4 4 level 4 IEC1000 4 11 EN55011 class B EN55022 class B EN50081...

Page 49: ...designation 40 D Declaration of conformity 43 Degree of protection 6 39 Dimensions 39 E Earthing 6 9 Electrical connection 10 18 Electrical safety 6 Electromagnetic compatibility 39 EMC 39 Emitted in...

Page 50: ...g solution 14 21 Rotate SP Module A 16 22 24 26 Rotate SP Module A at an event 27 Rotate SP Module A in a program 26 S Safety notes 6 39 Safety specifications 39 Screw nut 37 37 37 37 Figure 33 Instal...

Reviews: