![Metrohm 793 IC Instructions For Use Manual Download Page 11](http://html1.mh-extra.com/html/metrohm/793-ic/793-ic_instructions-for-use-manual_1779567011.webp)
2.1 Setting up the instrument
793 IC Sample Prep Module/ 8.793.1003 Instructions for Use
7
2 Installation
2.1 Setting up the instrument
2.1.1 Packaging
The 793 IC Sample Prep Module is supplied together with the sepa-
rately packed accessories in special packagings containing shock-
absorbing foam linings designed to provide excellent protection. The
actual instrument is packed in an evacuated polyethylene bag to pre-
vent the ingress of dust. Please store all these special packagings as
only they can assure damage-free transport of the instrument.
2.1.2 Check
After receipt, immediately check whether the shipment is complete and
has arrived without damage (compare with delivery note and list of
accessories in
section 5.2
). In the case of transport damage, see
instructions in
section 5.4.1
"Warranty".
2.1.3 Location
Position the instruments in the laboratory at a location convenient for
operation, free from vibrations and protected against a corrosive
atmosphere and contamination by chemicals.
2.1.4 Arrangement of the instruments
The best position for the 793 IC Sample Prep Module is beside the Mo-
dular IC System (e.g. 733 IC Separation Center).
The 793 IC Sample Prep Module should always be placed at the
bottom of the instrument stack so that any leaks which may occur in
the pump tubing or connections cannot cause damage to the other
instruments by leakage of corrosive liquids (e.g.acid).