Radiance Chassis Stacking Line Card 5
Installation Guide
Follow the simple steps outlined in this section to install and start using the
Radiance chassis stacking line card.
NOTE: Electrostatic discharge precautions should be taken when handling any
circuit board. Proper grounding is recommended (i.e., wear a wrist strap).
Unpack the Line Card
Your order has been provided with the safest possible packaging, but
shipping damage does occasionally occur. Inspect your card carefully.
If you discover any shipping damage, notify your carrier and follow
their instructions for damage and claims. Save the original shipping
carton if return or storage of the unit is necessary.
Set the Switches
Two sets of DIP switches, located on the back of the circuit board,
allow you to select from several modes of operation. These switches
are clearly marked on the printed circuit board.
1
2
DIP
switches
Power Connector
Port 1
Port 2
Port 3
DOWN
UP
Port 4
PWR
10/100 BASE
LK
AT
LK
AT
LK
AT
LK
AT
1
2
3
4
HDFL
FD
AN1
100M1
1 2 3 4
-----------OPEN-----------
AN4
100M4
AN3
100M3
AN2
100M2
---------------------- OPEN ----------------------
1 2 3 4 5 6
SW2
SW1
Default Switch Settings
SW1
SW2
HDFL = OPEN
AN4 = OPEN
FD = OPEN
100M4 = OPEN
AN1 = OPEN
AN3 = OPEN
100M1 = OPEN
100M3 = OPEN
AN2 = OPEN
100M2 = OPEN