13
7. CONTROL AND OPERATION
Control and Operation shall be in accordance with the instructions for the outdoor
unit .
8. MAINTENANCE
The particle filter in the supplied ball valve shall be cleaned after installation . Turn the
handle to off-position and undo the filter cap . Clean the filter cartridge, reassemble
and turn the handle to on-position .
9. DISASSEMBLY AND DECOMMISSIONING
The unit has to be decommissioned in the most environmentally proper manner . When
the product is discarded, please observe the local municipal waste removal
regulations .
10. TROUBLESHOOTING AND REPAIR
The condenser and associated pipes and pipe components is fully casted into high
efficient poly-urethane foam to ensure excellent insulation and heat preservation
properties . Therefore, component replacement is limited to the electrical control
board, pressure transmitter and temperature sensors .
10.1. Replacing temperature sensors BT3 and BT12 for the water pipes
• Leave the existing sensor in place .
• Install new sensor on the relevant pipe, BT3 on XL2 (Climate system return) and
BT12 on XL1 (Climate system supply) right above the spit box .
• Ensure good contact between sensor and pipe and good insulation .
• Guide the sensor cable to the control board by use of a spare cable gland (UB1, UB2
or UB3) .