NOTE
The pipe work must be flushed before the heat pump is connected, so that any
contaminants do not damage the components .
5. REFRIGERANT CIRCUIT
Install the refrigerant pipes (XL52 and XL53) between the outdoor module and the
split box .
Installation must be carried out in accordance with current norms and directives .
Observe the maximum pipe length, maximum high differences, pipe materials, pipe
diameters and other instructions as given in the installation manual for the outdoor
unit .
Install, test and commission the pipes between the split box to the outdoor unit
according to the guidance and instructions in the outdoor unit installation manual .
6. ELECTRICAL CONNECTIONS
Electrical installation and service must be carried out under the supervision of a
qualified electrician . Electrical installation and wiring must be carried out in
accordance with local rules and current norms and directives .
Connect the split box to the outdoor unit according to the instructions in the outdoor
unit installation manual .