
13.2.2009
Rev. 4.0
Installation
8
5.5
Cleaning
Wipe clean and dry the interior, the shelves and the exterior before use. For cleaning, use
a neutral or slightly alkaline cleaning agent.
5.6
Electrical connections
After the appliance has been three hours in place, it can be started. Connect the appliance
to the power supply with an earthed socket. For making the connection, a socket protected
with a 16 A fuse has to be provided. Check that the local power supply has the same volt-
age as the cabinet.
5.7
First run
Switch on the appliance with the main switch. Check that the internal temperature of the
cabinet reaches the value preset in the factory (-20 °) and that the timer functions normal-
ly.
Summary of Contents for SF 500
Page 2: ......
Page 4: ...13 2 2009 Rev...
Page 16: ...13 2 2009 Rev 4 0 Troubleshooting11 12...
Page 18: ...Refrigeration circuit diagram...
Page 22: ...13 2 2009 Rev 4 0 Technical specifications 18 Installation drawing 500 J G...
Page 23: ...13 2 2009 Rev 4 0 Technical specifications 19 Installation drawing 700 G J...
Page 25: ......