
|
17
11.3.2021
Metos S29
3. Installation
3.1. Unpacking
Carefully take the scale out of its package, make it sure its not damaged and all accessories are included..
• Remove the scale from the carton.
• Remove the protective covering. Store the packaging and to use if you need to transport the scale later.
• Inspect the scale and terminal for damage.
• Make sure all components are included
Accessories,
1. Scale
2. Adaptor
3. Pan
4. Product manual
3.2. Installation
• Remove transport lock from bottom of the scale base
• Place the scale on a level surface
• Unscrew HEX bolt first using a wrench which is in the box.(1)
• Attach the plate for platter(2)
• Install the stainless steel platter on top of the plastic plate(3)
•
3.3. Leveling
• The scale is equipped with a level indicator located left side of weight display.
• Use the adjustable leveling feet located on the bottom of the scale until the bubble appears in the
center of the indicator.
Level
Not level
3.4. Power Connection
• Connect the adaptor pin in to the scale adaptor jack.
• Adaptor jack is locating below the left side of the scale.
• Adaptor connects into your AC power socket. Plugable equipment must be installed near an easily
accessible socket outlet with a protective ground/ earth contact.
Summary of Contents for S29
Page 22: ...22 11 3 2021 Metos S29 ...
Page 23: ... 23 11 3 2021 Metos S29 ...
Page 24: ...www metos com ...