
13.5.2011
Rev. 2.2
Installation
53
5.7 Electrical connection
Supply voltages and frequencies can differ between countries. Check if the appliance is
suitable for connection to the local power mains. Check if the details on the type plate cor-
respond.
The earthed wall socket and the fused group with a main switch belong to the electrical
installation. No heavy machines that could cause variations in power when being switched
on, can be connected to this group. A machine with power current (three phase) is deliv-
ered from the factory without plug. At delivery, the machine must be provided with an
electrically suitable plug as advised and provided by the installer.
The following points should be observed when wiring a new plug:
1.
The green/yellow-coloured wire ("EARTH") should be connected to the terminal
which is either marked with the letter "E", the "earth" symbol (
), or coloured
green or green/yellow.
2.
The blue-coloured wire ("NEUTRAL") should be connected to the terminal which
is either marked with the letter "N" or coloured black.
3.
The brown-coloured wire ("PHASE") should be connected to the terminal which
is either marked with the letter "L1, L2 and L3" or coloured red.
Green/Yellow Earth
(E)
Blue
Neutral
(N)
3N~400V(5-core cable)
Brown
Live
(L1)
Black
Live
(L2)
Black
Live
(L3)
Green/Yellow Earth
(E)
Brown
Live
(L1)
3~230V (4 core cable)
Black
Live
(L2)
Black
Live
(L3)
Green/Yellow Earth
(E)
1N~230V (3 core cable)
Blue
Neutral
(N)
Brown
Live
(L)
Summary of Contents for CBW 10W
Page 2: ......
Page 4: ...13 5 2011 Rev 2 2...
Page 13: ...13 5 2011 Rev 2 2 Functional description 7 3 4 Construction 1x5W 1x10W 1x20W 2x5W 2x10W 2x20W...
Page 15: ...13 5 2011 Rev 2 2 Functional description 9 3 5 Contruction 5W 10W 20W...
Page 63: ...13 5 2011 Rev 2 2 Technical specifications 57 7 Technical specifications...
Page 64: ...Installation drawing...
Page 65: ...Installation drawing...
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......