background image

METEOR LIGHTING     

P: 213.255.2060     F: 213.596.3704     www.meteor-lighting.com

*METEOR LIGHTING reserves the right to make changes to this product at any time without prior notice and such modification shall be effective immediately.

Page 2

Installation Instructions

ADVANCED HIGH CEILING  

Whiz 2.0 - OCC sensor with Stem

Slot through the RJ45 connector and DC cables through a Hex 

screw and tighten the Hex screw on the stem grooves. 

Step 3

Step 4

Step 6

Fasten the top bracket on the desired location on the ceiling. 

Step 5

Align both lower and upper brackets and fasten in place. 

Unscrew the DC junction box and loosen the cable clamp. Insert the 

DC wire through the cable clamp and connect them to the wires in the 

junction box. After connection, ensure firmness by tightening cable 

clamp. Connect the RJ45 connector to the port on the power box. 

Refer to the wiring diagram for a detailed explanation. 

1

2

Reviews: