
PN T900-014, Rev B
Pre-Installation Requirements
Personnel Technical Level Required for Installation
The operations in this section should be performed only by qualified
service personnel experienced in electrical safety techniques. Never
service the ta7000F unless power to is has been removed, and it has
been allowed to cool for at least 90 minutes. Also, always use gloves
when working on the ta7000F.
Storage Prior to Installation
If the ta7000F is stored for any period of time prior to installation, store the
equipment in an environment where it is not subject to dripping or splashing
liquids, corrosive gases, high humidity, or excessive heat or cold. Recommend-
ed storage conditions include:
Temperature:
0 °C to 50 °C (32 °F to 122 °F)
Relative Humidity:
<70 %
Failure to comply with these storage conditions will void your warranty.
Unpacking and Inspecting the Equipment
Remove any packing material from the ta7000F Monitor. Check for damage. If
equipment is damaged, notify the carrier and contact AMETEK Service (
www.AMETEKpi.com/customersupport/requestsupport
) immediately if parts
are missing or damage is found, and to verify if damaged parts will require
replacement prior to safely installing and operating the equipment.
Perform the following inspections to ensure that the ta7000F has not been
damaged during shipment:
• Inspect the shipping container exterior for evidence of damage or indica-
tions of excess moisture before unpacking.
• Carefully open the shipping container and remove the ta7000F. Inspect the
exterior of the ta7000F for noticeable damage.
• Do not discard the shipping container until installation is complete.
Installation and Start-Up
|
2-3