2
METAL CONDUCTS ELECTRICITY:
Do not use this equipment where contact may be made with power lines or other live electrical circuits.
FAILURE TO UNDERSTAND AND FOLLOW ALL SAFETY RULES AND ASSEMBLY INSTRUCTIONS COULD
RESULT IN SERIOUS INJURY OR DEATH.
READ BEFORE BEGINNING ASSEMBLY.
DO NOT OVERLOAD:
Scaffolding maximum load: 800 lb (363 kg). Platform: 25 lb/sq. ft. (122 kg/m
2
)
ASSEMBLY PROCESS
1. Preparation
• Locate the tower, ensuring ground is level.
• Unlock the interlock pins on all frames.
• When installed, always move the interlock pin to the
“locked” position.
• Sort the braces into horizontal and diagonal braces
the diagonals are slightly longer.
• Unlock the brace locks.
Note the locking and unlocking position for
the casters.
2. Base
Step 1: Ensure interlock pins are removed from the base frame.
Step 2: Install caster frames (bottom frames).
Step 3: Insert the interlock pin as shown.
Step 4: Lock casters before ascending any part of the tower
3. Locking down the platform (Windlock)
A windlock clip is installed on the platform at the hook.
This is locked as shown here.