8.1
Minimal requirements for the boiler room
the
SD DUO
and
SD DUO
BIO boilers. the boilers do not require special
base
and need to be leveled with adjustable feet. the boiler must be set
in the vertical position.
The boiler must be placed on a flameproof pad that exceeds the boiler
outline by 2 cm. if the boiler is located in the basement, it is recommended
that it is placed on a base of at least 5 cm thick. the bearing of the floor and
the fire hazard conditions are the key elements of choosing the right
location for the boiler i.e:
•
20 cm from any flammable materials
•
40 cm from any flammable materials of C3 flammability
•
40 cm from any flammable materials of unknown flammability
8.1 B
(USER/INSTALLER)
ATTENTION!
For more information on boiler room
construction, refer to the 12.03.2009 Minister of
Infrastructure Law.
!
!
TIP!
The rules included in the law serve only as
guidelines which must be verified as the law
is amended.
T
able
8.1
Mass and building materials flammability
Flammability of
construction products:
B- difficult to ignite
C1- difficult to ignite
C3-Easily ignited
A- noncombustible
C2- normal combustibility
Construction products
W
ood- cement boards/beams, fibreglass,
mineral insulation
Beech wood, oak wood, plywood
Asphalt plywood, celluloid compound,
polyurethane, polystyrene, polyethylene,
plastics, PVC
Sandstone, concrete, bricks, fire-resistant
plaster, (concrete/ cement) mortar, tiles,
granite
P
ine, larch and spruce wood, corck, plank
boards, rubber floorings
The important element of installation is correct setting and levelling of
Summary of Contents for SD DUO BIO Series
Page 2: ......
Page 39: ...37 TROUGH BURNER...
Page 41: ...39 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Description 19 2 1 Trough burner schematics...
Page 43: ...41 C D E F G H A B I J K N O L Description 19 2 2 Through burner dimentions mm...
Page 51: ...49 21 C...
Page 52: ...50...
Page 53: ...51...
Page 54: ...52...
Page 58: ...56...
Page 60: ...58...
Page 65: ...63 N...
Page 66: ...64 N...
Page 67: ......
Page 68: ...METAL FACH J K TECHNIKA GRZEWCZA 16 100 S 66 48 85 711 94 54...