
Foundation level and baseplate grouted.
S
ERIES
3000 H
ORIZONTAL
P
UMPS
O
PERATIONAL
S
TART
-
UP
C
HECKLIST
Foundation bolts tight.
Coupling aligned without sleeve.
Motor and pump mounting bolts tight.
Suction and discharge connections secure.
Flush piping installed if required.
Electrical connections secure and covered.
Lubricate power-frame as required.
Ensure that coupling sleeve is not installed.
Jog motor/Check rotation.
Turn pump shaft by hand, ensure that it does not bind.
Check shaft alignment and install coupling sleeve.
Ensure that all guards are in place.
Ensure seal is properly flushed.
Suction valve is open, Discharge valve is slightly open.
Ensure that pump is primed.
Start pump and open discharge valve to desired flow rate.
Check flush water flow and pressure.
Check oil level if so equipped.
Check for excessive vibration and oil temperature.
Check packing for leakage and mechanical seal for no leaks after run-in.
17