
English
8
GB
The R-080511 is a practical gel mixer specially
designed for use within the mechanical dentistry
sector. It enables the gel placed in the container to
a heating and stirring lea defined by the user which
consists of three phases:
1. A prior waiting period, during which the unit
remains on standby awaiting the heating phase
to commence.
2. A heating period, in wich the gel temperature
rises to a value (C1) set beforehand by the user,
between 65 and 95 ºC. During this phase
heating temperature is higher than the
subsequent pouring temperature. The idea is to
achieve a homogeneous gel mixture and without
any clots. Also, this phase the mixer blades are
set in motion in order to further favour the
correct mixing of the gel.
3. Once the heating phase the gel achieves an
optimum texture, but its temperature is too high
for pouring. A cooling period then commences
forced by a fan which ends when the gel
temperature reaches a value (C2) preset by the
user (30-65 ºC). Once the third phase has been
completed, the gel is then ready for pouring
INSTALLING THE UNIT
Carefully unpack the gel mixer.
Choose a flat surface to place it on, far from any
heat or vibration sources. We also recommend
choosing a location which is sufficiently
ventilated.
Be sure to leave a space between the surface of
the table and the legs top, given that the cooling
air from the container is collected. Also, leave 15
cm between the back cooling grid and the wall.
Conect the unit to a 230 V, 50/60 Hz electric
outlet with an earth connection.
TEMPETARUTE SETTING
1. Connect the main switch of the unit (F).
2. Upper and lower displays will show the C1 and
C2 temperatues respectively.
3. You can modify both of them by pressing the
keys.
4. To shift from a display to the other press the
key. The doth at the rightside indicates the
active display.
5. Both temperaturas can be modified even when
the unit is working.
ALARM
The R-080511 Gel Mixer allows you to activate an
acoustic alarm to warn when the gel is ready to
pour. When the unit finishes the cycle, the display
will read “End”. If the alarm is on ( pilot light on),
an acoustic signal will go off as well.
To activate or deactivate the alarm:
Press the
key for a few seconds to entering
the configuration mode.
You will see that the
(alarm)
pilot light is
flickering.
Select
“YES”
or
“NO”
on the upper display in
order to activate or deactivate the alarm by
pressing the
keys.
Press shortly the
key to shift to the lower
display.
Select the type of alarm (1 or 2) by pressing the
keys.
1 The alarm will go on only once.
2 The alarm will go on every 2 minutes.
Press the
key for a few seconds to escape
from the configuration mode.
DELAYED STARTUP
The R-080511 Gel Mixer allows you to program a
delayd startup:
Press the
key for a few seconds to entering
the configuration mode.
You will see that the
(alarm)
pilot light is
flickering.
Press shortly the
key to see at the upper
display the message
“dEL”
(delayed startup).
By pressing the
keys, select at the lower
display the time (hours) you want the unit keeps
waiting before start heating.
Press the
key for a few seconds to escape
from the configuration mode.
Now, when you press the
START/STOP
button
(C) to start the unit, upper display will show the
message
“dEL”
and the lower one will show the
number of resting hours. After the waiting time,
the unit will start up.
TEMPERATURE IN ºC/ºF
The R-080511 Gel mixer allows you to read the
temperatura in ºC or ºF:
Press the
key for a few seconds to entering
the configuration mode.
You will see that the
(alarm)
pilot light is
flickering.
Summary of Contents for ANETO
Page 7: ...Espa ol 7...
Page 11: ...English 11...