Mesto Neles XH Series Installation Maintenance And Operating Instructions Download Page 6

6

1 XH 70 en

3.2.1 Valve insulation

If necessary, the valve may be insulated. Insulation must not
continue above the upper level of the valve body, see
Figure 9.    

3.3

Actuator 

The valve open/closed position is indicated as follows:

‰

by an indicator on the actuator
or

‰

by a groove at the end of the ball shaft (parallel to
the ball flow opening).

If there is any uncertainty about the indicator, check the ball
position by the groove.
The actuator should be installed in a manner that allows
plenty of room for its removal.
The upright position is recommended for the actuator cylinder. 
The actuator must not touch the pipeline, because pipeline
vibration may interfere with its operation.
In certain cases it may be considered advantageous to pro-
vide additional support to the actuator. These cases will nor-
mally be associated with large actuators, extended shafts, or
where severe vibration is present. Please contact Metso
Automation for advice.

3.4

Commissioning

Ensure that there is no dirt or foreign objects left inside the
valve or pipeline. Flush the pipeline carefully. Make sure that
the valve is entirely open when flushing.
Ensure that all nuts, pipings, and cables are properly fas-
tened.
Check that the actuator, positioner, and switch are correctly
adjusted. Actuator adjustment is explained in Section 6. To
adjust the accompanying device refers to the separate con-
trol equipment instruction manuals.

4

MAINTENANCE

4.1

Maintenance general

Although Metso’s Neles valves are designed to work under
severe conditions, proper preventative maintenance can
significantly help to prevent unplanned downtime and in
real terms reduce the total cost of ownership. Metso recom-
mends inspecting the valves at least every five (5) years. The
inspection and maintenance interval depends on the actual
application and process condition. The inspection and
maintenance intervals can be specified together with your
local Metso experts. During this periodic inspection the
parts detailed in the Spare Part Set should be replaced. Time
in storage should be included in the inspection interval.
Maintenance can be performed as presented below. For
maintenance assistance, please contact your local Metso
office. The part numbers in the text refer to the exploded
view and to the parts list in Section 10, unless otherwise
stated.

4.2

Changing the gland packing while the 

valve is in the pipeline

In graphite gland packings, tightness is ensured by contact
between the gland follower and the packing rings.
The gland packing (69) must be changed if leakage occurs
even after the hex nuts (18) have been tightened.

‰

Make sure that the valve is not pressurized.

‰

Detach  the  actuator  and  bracket  according  to  the
instructions in Section 4.4.

‰

Remove the key (10).

Fig. 9

Insulation of the valve

NOTE:

When installing the actuator on the valve, make sure that
the valve package functions properly. Detailed informa-
tion on actuator installation is given in Section 6 or in the
separate actuator instructions.

I n s u l a t i o n

CAUTION:
Observe the safety precautions mentioned in Section

1.8 before maintenance!

CAUTION:
When  handling  the  valve  or  the  valve  package  as  a

whole,  bear  in  mind  the  weight  of  the  valve  or  the

entire package!

NOTE:

When sending goods to the manufacturer for repair, do
not disassemble them. Clean the valve carefully and flush
the valve internals. For safety reasons, inform the manufac-
turer of the type of medium used in the valve (include
material safety datasheets (MSDS)).

NOTE:

In order to ensure safe and effective operation, always use
original spare parts to make sure that the valve functions
as intended.

NOTE:

For safety reasons, replace pressure retaining bolting if the
threads are damaged, have been heated, stretched or cor-
roded.

CAUTION:

Do not dismantle the valve or remove it from the pipe-

line while the valve is pressurized!

Summary of Contents for Neles XH Series

Page 1: ...1 XH 70 en 4 2020 NELES TRUNNION MOUNTED BALL VALVE FULL BORE Series XH Installation Maintenance and Operating Instructions...

Page 2: ...peline 5 3 3 Actuator 6 3 4 Commissioning 6 4 MAINTENANCE 6 4 1 Maintenance general 6 4 2 Changing the gland packing while the valve is in the pipeline 6 4 3 Repair of a jammed or stuck valve while it...

Page 3: ...f service with high pressure differentials 1 3 Markings Body markings are stamped on the body see Fig 2 The identification plate Fig 3 is attached to the flange Identification plate markings are 1 Bod...

Page 4: ...ing or removing a pressurized valve will result in uncontrolled pressure release Always isolate the relevant part of the pipeline release the pressure from the valve and remove the medium before disma...

Page 5: ...t recommend installing the valve with the actuator on the underneath side because dirt in the pipeline may then enter the body cavity and damage the gland packing The posi tion to be avoided is shown...

Page 6: ...ess condition The inspection and maintenance intervals can be specified together with your local Metso experts During this periodic inspection the parts detailed in the Spare Part Set should be replac...

Page 7: ...in the Table 1 by 50 or do not fully compress the disc springs Table 1 Tightening of gland packing 4 3 Repair of a jammed or stuck valve while it is in the pipeline Jamming may be due to the ball 3 a...

Page 8: ...ion plates 89 and bearings 91 99 out of the body 1 Handle the ball carefully and place it on a soft surface Remove the seat 7 from the body 1 Remove the trunnion plates 89 from the hubs of the ball Re...

Page 9: ...d the body 1 See that the flange holes are aligned acc to the mark made during the dismatling Take care not to damage the body gasket and the seat 7 in the body cap Fasten the body nuts 16 Tighten the...

Page 10: ...indicates the ball flow opening position Keep fingers out of the flow bore There is no need for stop screw adjustment if the actuator is re installed in the same valve Drive actuator piston to the ho...

Page 11: ...ommended action Leakage through a closed valve Wrong stop screw adjustment of the actuator Adjust the stop screw for closed position Faulty zero setting of the positioner Adjust the positioner Damaged...

Page 12: ...odycap 3 1 Ball 3 5 1 Shaft 3 7 1 or 2 Ball seat 2 8 1 Bonnet 9A 1 Gland 9B 1 Sleeve 10 1 Key 3 12 Stud 13 Stud 14 Stud 16 Hexagon nut 17 Hexagon nut 18 Hexagon nut 42 1 Retainer ring 62 1 or 2 Seat s...

Page 13: ...5 1010 423 1474 1195 38 10 280 165 181 8 5020 5610 20 500 1321 549 855 1114 471 1508 1194 44 45 315 180 199 5 6530 7390 24 600 1549 643 1040 1300 570 1720 1350 50 80 370 220 242 4 11000 12000 XHG Clas...

Page 14: ...ME Class 900 4 END CONNECTION STYLE W Raised face ASME B 16 5 Ra 3 2 6 3 standard Z Ring joint ASME B16 5 5 CONSTRUCTION APPLICATION TA Standard construction Double seated Live loaded packing TZ BAM t...

Page 15: ...1 XH 70 en 15...

Page 16: ...atu 2 PO Box 1220 00100 Helsinki Finland Tel 358 20 484 100 http contact metso com Neles Finland Inc Vanha Porvoontie 229 P O Box 304 FI 01301 Vantaa Finland Tel 358 20 483 150 Fax 358 20 483 151 www...

Reviews: