OPTION 1
-
FITTING HORIZONTAL TOP RAIL
5
Step 7.
Re-position panel into wall profile and onto the ferrule on the tray,
drill through profiles at similar position to wall fixing screws and fix to
wall profiles with screws
V4110
,clips
V2114
& snap-on caps
V2115.
Step 8a.
Screw the horizontal support bar holder
V8119
onto the
support bar ferrule
V6S6SW05.
Step 9a.
Cut the support bar
Insert the horizontal support bar
V1121
into the holder
V8119
and position the assembled wall ferrule
V8121-V8122
at the
other end. Level the bar and mark the position, remove the
bar and ferrule assembly.
V1121
to size
.
DO NOT CUT TOO SHORT
Step 10a.
Align and secure the wall mount
horizontal support bar wall ferrule
V8121
using
plugs sad screws
V4115.
V8122
for the
Step 11a.
Screw the ferrule
the wall mount. Insert the
support bar
V1121
right into the
holder
V8119
then slide it back
into the wall ferrule.
V8121
onto
Step 12a.
Check panel column is plumb vertical.
Tighten the grub screws at both ends of the support bar to
secure.
TIGHTEN
TIGHTEN
∅
7mm
masonry bit
V8125
V6115
V2114
V4110
V2115
LE
VE
L
MARK
IN
SE
RT
7
8a
9a
10a
11a
12a
V8119
V8122
V4115
V8122
V8121
V6M5X5