
mcr ZIPP
fire protection shut-off valve
MERCOR SA –
The company reserves the right to modify and change the document. Version 20.10.20.5
9/14
a)
b)
c)
Figure 9. Sample setting of a connection stub pipe in a plasterboard wall
NOTE
Pay particular attention to maintain the roundness of the connection stub pipe when filling the gap with
mortar. Possible surfaces which are not round will make it impossible to set the valve.
Set the prepared valve in the connection stub pipe. If it's possible to access the space between the nozzle and the
stub pipe wall, it should be packed with mineral wool (fig. 10).
Figure 10. Sample installation of the mcr ZIPP valve in a plasterboard wall.
1- Connection stub pipe
2 – e.g. gypsum plaster or mortar
3 – Plasterboard wall
4 – Extension stub pipe
5 – Mineral wool with density of at least 80
kg/m3.
6 – Screw for fixing to plasterboard
7 – construction profile
8 – E.g. polyurethane foam EI 120
X – wall thickness
1- Connection stub pipe
2 – e.g. gypsum plaster or mortar
3 – Plasterboard wall
4 – Extension stub pipe
5 – Ventilation duct
6 – Screw for fixing to plasterboard
7 – construction profile
X – wall thickness