![Mercia Garden Products Snowdrop General Instructions Manual Download Page 7](http://html1.mh-extra.com/html/mercia-garden-products/snowdrop/snowdrop_general-instructions-manual_1772732007.webp)
Step 13
Parts needed -
Fix the Rail Guard (
No. 9
) to the
Bunk floor using 4x60mm
screws as shown.
Fix the assembled Ladder with
4x60mm screws. Screw through
the ladder into the Floor, Rail
Guard and Plain Gable as shown
in the diagram.
8x60mm screws
60mm
screw
9
Step 14
Parts needed - & x2 & x2
Line the Support Block x2
(No. 18)
up with the gable framing as shown, use
4x40mm screws to fix.
Place the Roof Support Bar (
No.
14
) on top of the support block and using
Corner Braces x2 (
No. 33
) fix with
4x30mm screws per brace.
8x30mm screws
8x40mm screws
30mm
screw
40mm
screw
18
33
14
14
18
33
1!
2!
Pre drill
hole
1!
2!
Pre drill
hole
P 7
Please retain product label and instructions for future reference
DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY
COMPONENT PARTS PRIOR TO ASSEMBLY.
1!
2!
Pre drill
hole
50kg
Step 12
Parts needed -
Place the Bunk Floor
(No. 6)
onto the framing. Fix from
underneath going through
the framing, up into the bunk
floor using 4x60mm screws
each side.
8x60mm screws
1st floor
60mm
screws
Framing
The bunk floor will not sit flush if
the building is not sitting square.
The building may need to be
adjusted accordingly before fixing
the bunk floor in place.
*Make sure the bunk floor sits up against
the framing of the Window Panel and flush
against the Plain Panel.
1!
2!
Pre drill
hole
50kg
9
7
Step 15
Parts needed - & & x2
Fix a Roof Eave x2 (
No. 13
) to
each roof sheet (
No. 7
&
No. 8
) using
4x30mm screws per eave.
Position the roof sheets on
the building and fix to the roof
support bar the rail guard and the
sides of the building using
25x30mm screws. Ensure the roof
overhangs at the front of the build-
ing and is flush at the back.
33x30mm Screws
30mm
screw
8
7
13
8
13
6
60mm
screw
A
B
A
B
A
B
A
B