background image

P 6

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

Please retain product label and instructions for future reference

             

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

Step 8

Parts needed -             & 

 

Fix the Bunk Floor Block D 

(No. 24) 

to the door gable using 1x40mm screw 

through the framing into the block. 

 

Then fix the Bunk Floor Block C 

(No. 23) 

onto the framing as shown in the 

diagram. Fix using 1x40mm screw in the 

left of the block through the framing.

 

Fix with a 1x40mm screw down 

into block D.

3x40mm screws

24

23

Step 9

Parts needed -           &           x2 

 

Fix the other 2x Bunk Floor 

Block D 

(No. 24) 

to the door gable 

using 1x40mm screw through the 

framing into each block as shown in 

the diagram. 

 

Then fix the Bunk Floor Block 

(No. 23)

 onto the framing as shown 

in the diagram. Fix using 2x40mm 

screws down into block D.

4x40mm screws

24

23

1!

2!

Pre drill 

hole

1!

2!

Pre drill 

hole

Step 10

Parts needed -            &           x2

Away from the building, fix the Bunk Floor 

Block A 

(No. 21)

 x2 to the Bunk Floor 

(No. 

6)

 from underneath. Fix through the 

framing into the blocks using 4x50mm 

screws.

4x50mm screws

Make sure this side 

of the block is flush 

to the building.

19

Step 11

Parts needed -           &            x3

 

To assemble the ladder, slot each 

Ladder Step x3 (

No. 20

)into the 

grooves of the Left and Right Ladder 

Sides (

No. 19

). Fix with 4x50mm 

screws per step as shown. 

12x50mm screws. 

50mm 

screw

19

20

20

19

6

21

23

24

23

24

24

30mm 

gap

21

50mm 

screw

40mm 

screw

40mm 

screw

21

A

B

C

B

A

C

A

A

B

A

B

Summary of Contents for Snowdrop

Page 1: ...hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be sligh...

Page 2: ...all Roof Sheet 1795x990mm 8 AI 02SNO0705 V4F AI 02SNO0705 V4BF PI 03 0030 PI 03 0031 Rail Guard 9 10 Door 11 Window QTY x3 AI 02PHOW V1 AI 02SNO0705 V4CR AI 02SNO0705 V4D Support Block 495mm 13 14 15...

Page 3: ...50mm Screw x 53 60mm Screw x 22 20mm Screw x 16 40mm Screw x 40 Felt Tacks x 80 10mm Screw x 5 30mm Black Screw x 21 Nail Bag 25 Finial 26 27 28 Door Stop Window Frame Butterfly Window Shutters Window...

Page 4: ...x3 Lay the Door Gable No 1 with the boards facing up on a flat surface Place the door within the door aperture and position the Door No 10 so that you have a 12mm gap from the door to the door gable o...

Page 5: ...n previously in step 5 Position the panels so that they sit central on the floor 9x50mm screws 50mm screw 1 3 1 2 Pre drill hole 1 2 Pre drill hole 1 2 Pre drill hole Step 7 Parts needed Fix the Bunk...

Page 6: ...mm screw through the framing into each block as shown in the diagram Then fix the Bunk Floor Block C No 23 onto the framing as shown in the diagram Fix using 2x40mm screws down into block D 4x40mm scr...

Page 7: ...IOR TO ASSEMBLY 1 2 Pre drill hole 50kg Step 12 Parts needed Place the Bunk Floor No 6 onto the framing Fix from underneath going through the framing up into the bunk floor using 4x60mm screws each si...

Page 8: ...of is fitted and the building is square secure the building to the Floor fixing the panels onto the floor using 18x50mm screws in alignment with the floor joists 18x50mm Screws 50mm screw Step 17 Part...

Page 9: ...ews Fix the Window Shutters x2 No 30 through the Door Gable into the shutter using 4x30mm screws per shutter Repeat with both windows 12x40mm screws 60mm screw 29 30 A B A B 1 2 Pre drill hole 1 2 Pre...

Page 10: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Reviews: