Mercia Garden Products Helios 03HEL1010DDFW-V3 General Instructions Manual Download Page 8

30mm 

screw

Pre drill 

hole

30mm 

screw

Pre drill 

hole

Sla

ve D

oor

Lock
ing D

oor

24

24

25

26

25

26

26

Step 15

Fix the cover trims (

No’s. 24, 25 & 26

around the building across the joints 

on each panel and at the corners 

using 3x30mm screws per trim.

 

21x30mm Screws

Step 16

Attach the turn buttons (No. 35) 

to the top & bottom of the slave

door using 2x30mm black screws.

*These turn buttons help to keep 

your doors straight during high 

and low levels of moisture

content in the air.

 

2x30mm Black Screws

35

Please retain product label and instructions for future reference

             

50mm 

screw

Pre drill 

hole

50mm 

screw

Pre drill 

hole

SILICONESEALANT

Step 17

Attach the sml rain guards 

(

No. 17

) centrally above 

each window using 

3x50mm screws per guard.

 

18x50mm Screws

27

37

Step 18

Secure the lrg rain guard 

(

No. 16

) above the doors, 

fixing into place using 

4x50mm screws.

*ensure to screw into the 

framing above door.

 

4x50mm Screws

SILICONESEALANT

*Hint: Silicone seal the back of each

rain guard to help reduce water

running behind.

*Hint: Silicone seal the back of the

rain guard to help reduce water

running behind.

Summary of Contents for Helios 03HEL1010DDFW-V3

Page 1: ...can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry sp...

Page 2: ...R1516X2356 V1 Front Floor AI 03HELTAGFLOOR2907X717 V1 Back Floor QTY 2 AI 03HELTAGFLOOR1459X2387 V1 Master Door AI 03HEL1010MD Slave Door AI 03HEL1010SD Roof Bar QTY 4 AI 03HELRB2828X101 V1 Roof Block...

Page 3: ...hinges No 34 to both the master No 12 slave No 13 doors using 3x30mm screws per hinge Fix to the doors via the outer plate Fix the doors into the door panel No 1 aperture securing into place using 3x3...

Page 4: ...l product and is subject to movement with changing weather conditions It is important that you fit the turn buttons and tower bolts as per the fitting instructions 50mm screw Pre drill hole 60mm screw...

Page 5: ...mm screw Step 6 Place the first ridge bar No 14 inside the building and line up with the upright framing on each gable Align the back edge of the ridge bar with the top of the gable Once in place mark...

Page 6: ...hole 7 20 Step 9 Place the front roof No 7 onto the assembly securing into place using 4x40mm screws as shown in the illustration Following the same method outlined in step 8 fix the front roof inter...

Page 7: ...e last sheet which requires 250mm overlap 165x Felt Tacks HANDLE WITH CARE 1 2 3 4 Step 13 To secure the roof felt in place sandwich the felt between the top No 21 and bottom No 22 roof trims as shown...

Page 8: ...ent in the air 2x30mm Black Screws 35 Please retain product label and instructions for future reference 50mm screw Pre drill hole 50mm screw Pre drill hole S IL IC O N E S E A L A N T Step 17 Attach t...

Page 9: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instruct...

Reviews: