Mercia Garden Products Helios 03HEL1010DDFW-V3 General Instructions Manual Download Page 6

P 6

Please retain product label and instructions for future reference

             

Please retain product label and instructions for future reference

             

25

88

8

14

8

Step 8

Rest the left roof (

No. 8

) on top of the 

supports and secure with 20x40mm

screws as shown in the illustration.

*Ensure to align the screws with each

roof support bar.

Fix the roof (

internally

) to the roof

support bar using 8x40mm screws 

(

making sure the roof framing sits 

behind the support bar

.

Repeat this process with the right

roof (

No. 9

), ensuring there is an equal

amount of overhang either side of the

building.

 

56x40mm Screws

40mm 

screw

Pre drill 

hole

7

20

Step 9

Place the front roof (

No. 7

) onto the 

assembly securing into place using 

4x40mm screws as shown in the 

illustration.

Following the same method outlined in

step 8 fix the front roof (

internally

) to the

roof support bar using 4x40mm screws.

 

8x40mm Screws

40mm 

screw

Pre drill 

hole

60mm 

screw

Pre drill 

hole

Step 10

Position the large (

No. 18

) and 

the small (

No. 19

) roof ends 

onto the roof.

*Ensure the tongue & groove

meet and the boards sit flush

with the roof framing.

Fix the boards in place using

12x40mm screws, making sure

to screw through the roof and

gable framing.

 

12x40mm Screws

40mm 

screw

Pre drill 

hole

a

a

a

a

a

a

a

Step 11

 

Now the roof has been fitted

 

secure the building to the 

 

floor with 36x60mm screws

*Ensure to align the screws with the

floor bearers.

 

36x60mm Screws

a

19

18

19

18

7

Summary of Contents for Helios 03HEL1010DDFW-V3

Page 1: ...can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry sp...

Page 2: ...R1516X2356 V1 Front Floor AI 03HELTAGFLOOR2907X717 V1 Back Floor QTY 2 AI 03HELTAGFLOOR1459X2387 V1 Master Door AI 03HEL1010MD Slave Door AI 03HEL1010SD Roof Bar QTY 4 AI 03HELRB2828X101 V1 Roof Block...

Page 3: ...hinges No 34 to both the master No 12 slave No 13 doors using 3x30mm screws per hinge Fix to the doors via the outer plate Fix the doors into the door panel No 1 aperture securing into place using 3x3...

Page 4: ...l product and is subject to movement with changing weather conditions It is important that you fit the turn buttons and tower bolts as per the fitting instructions 50mm screw Pre drill hole 60mm screw...

Page 5: ...mm screw Step 6 Place the first ridge bar No 14 inside the building and line up with the upright framing on each gable Align the back edge of the ridge bar with the top of the gable Once in place mark...

Page 6: ...hole 7 20 Step 9 Place the front roof No 7 onto the assembly securing into place using 4x40mm screws as shown in the illustration Following the same method outlined in step 8 fix the front roof inter...

Page 7: ...e last sheet which requires 250mm overlap 165x Felt Tacks HANDLE WITH CARE 1 2 3 4 Step 13 To secure the roof felt in place sandwich the felt between the top No 21 and bottom No 22 roof trims as shown...

Page 8: ...ent in the air 2x30mm Black Screws 35 Please retain product label and instructions for future reference 50mm screw Pre drill hole 50mm screw Pre drill hole S IL IC O N E S E A L A N T Step 17 Attach t...

Page 9: ...apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instruct...

Reviews: