Mercia Garden Products Cherry Playhouse General Instructions Manual Download Page 8

P 8

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

AFTER TREATMENT:

score around protective

 cover on glazing and

 carefuly peel

 covering back

Playhouse Maintenance:

It is recommended that the following checks and maintenance are carried out at the begin-

ning of each season as well as at regular intervals during the usage season.

- Check all nuts /bolts/ screws for tightness and tighten when required.

- Check for movement / opening of wood giving rise to protrusion of nail heads and tips.

- Check hinges.

- Replace defective parts in accordance with the manufacturers instructions. 

- Check any crossbeams, suspensions and anchors.

- If a swing is included; check the swing seat, chains and ropes.

IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD

Summary of Contents for Cherry Playhouse

Page 1: ...rd surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly...

Page 2: ...8 9 10 11 12 Ridge Bar 28x28x1048mm Eaves Frame 28x28x1205mm Floor Joist 28x28x1110mm Fascia 95x12x800mm Fascia Block 44x44x200mm QTY x2 QTY x4 QTY x4 FS2828 1048mm FS2828 1205mm FS2828 1110mm FAS800...

Page 3: ...Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer D...

Page 4: ...oor opening It is important that the door is placed central in the space provided with a 12mm gap around the edge Use a 12mm strip to help keep the gap correct Fix the Hinges x2 No 19 to the door fram...

Page 5: ...2 3 Step 5 Parts needed Attach the Door Gable No 1 to the remianing Window Side No 3 with 6x50mm screws Position the panels so there are equal gaps between the floor and cladding Fix the corners with...

Page 6: ...p 8 Position the building square between the floor and cladding Fix the building to the floor using 50mm screws as shown in the illustration Use 3x50mm screws per panel making sure to screw into the f...

Page 7: ...Parts needed Place a Window Cross No 16 against the inside of each window Position the frame centrally to the window and fix using 4x20mm screws per frame 12x20mm screws Place the Wooden Door Handle...

Page 8: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Reviews: