background image

13

14

02CHY0404-V5-PEFC

Overall Dimensions:

Width = 1416mm 

Depth = 1253mm 

Height = 1398mm

Base Dimensions: 

Width = 1171mm 

Depth = 1110mm 

Please retain product label and instructions for future reference

           

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P2

19

16

Finial

SHED DIAMOND FINIAL

QTY x2

15

18

17

20

2

1

3

Door Gable

Plain Gable

Window Side

QTY x2

AI-02CHY0404-V4DG

AI-02CHY0404-V4PG

AI-02CHY0404-V4WS

8

9

10

11

12

Ridge Bar - 28x28x1048mm 

Eaves Frame - 28x28x1205mm 

Floor Joist - 28x28x1110mm 

Fascia - 95x12x800mm 

Fascia Block - 44x44x200mm 

QTY x2

QTY x4

QTY x4

FS2828-1048mm

FS2828-1205mm

FS2828-1110mm

FAS800

F4444-240mm (ANGLED)

4

5

6

7

QTY x3

Window 

AI-02PHOW-V1

Floor Sheet 

Roof Sheet 

Door

QTY x2

PI-03-0004

PI-03-0002

AI-02CHY0404-V4D

Door Styrene

PI-05-0014

Door Flower

PI-04-0016

Window Cross

QTY x3

PI-04-0013

Corner Brace

QTY x2

PI-07-0011

Window Block

QTY x6

PI-07-0012

Wooden Door Handle

Hinge 

QTY x2

PI-04-0024

PI-07-0113

1!

Look for the symbols and follow the safety guidlines below.

Ensure screw heads 

are subflush and 

sand down any 

splinters created.

Ensure the screws are 

fixed squarely and do 

not protrude.

12mm gap  

surrounding the 

door.

2!

3!

50kg

 

50kg per user

Summary of Contents for Cherry Playhouse

Page 1: ...rd surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly...

Page 2: ...8 9 10 11 12 Ridge Bar 28x28x1048mm Eaves Frame 28x28x1205mm Floor Joist 28x28x1110mm Fascia 95x12x800mm Fascia Block 44x44x200mm QTY x2 QTY x4 QTY x4 FS2828 1048mm FS2828 1205mm FS2828 1110mm FAS800...

Page 3: ...Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer D...

Page 4: ...oor opening It is important that the door is placed central in the space provided with a 12mm gap around the edge Use a 12mm strip to help keep the gap correct Fix the Hinges x2 No 19 to the door fram...

Page 5: ...2 3 Step 5 Parts needed Attach the Door Gable No 1 to the remianing Window Side No 3 with 6x50mm screws Position the panels so there are equal gaps between the floor and cladding Fix the corners with...

Page 6: ...p 8 Position the building square between the floor and cladding Fix the building to the floor using 50mm screws as shown in the illustration Use 3x50mm screws per panel making sure to screw into the f...

Page 7: ...Parts needed Place a Window Cross No 16 against the inside of each window Position the frame centrally to the window and fix using 4x20mm screws per frame 12x20mm screws Place the Wooden Door Handle...

Page 8: ...d that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tight...

Reviews: