P 11
Please retain product label and instructions for future reference
23b
27
27
27
26
Step 20
Parts needed - No. 27 QTY 104
Place the first two Roof
Board’s (No. 27) onto the assembly
on each side, making sure the
boards are flush to the end of the
roof purlin. Once in position fix to
each purlin using 4x40mm screws.
*Ensure the roof boards meet
at the top of the apex and leave
an overhang at the bottom.
Due to natural occurences of wood
shrinkage / expansion. You maybe
required to use the provided spacers
and place a space of 2mm to ensure
every roof board lines up with the
truss’.
Continue adding the roof boards
along the roof, fixing each one into
position using 4x40mm screws,
making sure that each board is
interlocked, flush at the bottom &
meet at the top of the apex.
The last board on each side
will overhang: Using a staight edge
and a pencil mark out a line as
a guide.
Cut along the pencil mark and
remove the excess. Place the cut
down board’s back onto the roof and
secure into place using 4x40mm
screws per board.
*Please Note:
This image is for
illustrative purposes and may differ
from your choice in product.
Nevertheless the process of cutting
and fitting the last roof boards is the
same.
416x40mm Screws
40mm
screw
Pre drill
hole
*Cut to fit
a
b
Step 21
Parts needed - No. 26 QTY 4
Ensuring the roof boards are
flush at the overhanging side
and meet at the apex, fix the
eaves frames (No. 26) to the
underside of the roof boards
using 9x40mm screws as
shown in the illustration
*Please Note:
This image is for
illustrative purposes and may
differ from your choice in
product. Nevertheless the
process of fixing the eaves
frames is the same.
36x40mm Screws
40mm
screw
Pre drill
hole