P 10
Please retain product label and instructions for future reference
21
21
21
21
22
Pre drill
hole
Step 19
Parts needed - No. 21 QTY 4
No. 22 QTY 1
Align the Purlin(
s
) (No. 21) into the
cut out slots on each gable top at the
rear of the building ensuring each roof
purlin interlocks the boards. Following the
same outlined method place the
Front Purlin (No. 22 -
3x notches
)
into cut out slots at the front of the
building ensuring it interlocks
the boards.
Secure the Purlins at each end by
screwing through the bars into the
boards (ensure to pre-drill to avoid
the boards splitting) using 4x70mm
screws per purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in product.
Nevertheless, despite any differences
the process of fixing the roof purlins
is the same.
20x70mm Screws
70mm
screw
IMPORTANT: Pre-drill before fixing screws.
a
b
a
b
Step 18
(See Pre-Assembly)
Parts needed - No. 4a QTY 1
No 4b QTY 1
No. 4c QTY 1
No. 4d QTY 1
No. 5a QTY 1
Parts No. 4a, 4b, 4c, 4d & 5a are
the last log boards from the
gables; rest these into position
and secure through the
notches in the board.
*Ensure that the boards are
level and flush with each other
as you lay each one.
**Ensure to stagger the screws
to ensure not to collide.
8x70mm Screws
Pre drill
hole
70mm
screw
4a
4b
4c
5a
4d