
P 8
Please retain product label and instructions for future reference
Step 10
(See Pre-Assembly)
Parts needed - No. 11 QTY 2
Place the last two boards
(No. 11) onto the building.
Secure into position at
either end by screwing
through the notch into the
board below.
*Ensure that the boards are
level and flush with each
other as you lay each one.
**Ensure to stagger the
screws so as not to collide
with the previous screw.
4x70mm Screws
Pre drill
hole
70mm
screw
11
11
IMPORTANT: Pre-drill before fixing screws.
IMPORTANT: Pre-drill before fixing screws.
Pre drill
hole
Step 11
Parts needed - No. 18 QTY 3
Align the Roof Purlin(
s
) (No.
18) into the cut out slots on each
gable top ensuring each roof purlin
interlocks the boards.
Secure the roof purlins at
each end by screwing through the
purlins into the boards (ensure to
pre-drill to avoid the boards
splitting) using 4x70mm screws per
roof purlin.
*Please note:
The gable shown is for
illustrative purposes and may differ
in width from your choice in
product.
Nevertheless, despite any
differences
the process of fixing the roof purlins
is the same.
70mm
screw
18
18
18
18
a
b
a
b