Mercia Garden Products 0634LOG249-V4 General Instructions Manual Download Page 12

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

P 12

Please retain product label and instructions for future reference

             

Summary of Contents for 0634LOG249-V4

Page 1: ...r during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during...

Page 2: ...893mm QTY 12 LB34 C 893 Log Board 34x120x1625mm QTY 24 LB34 B 1625 Log Board 34x120x5000mm QTY 19 LB34 A 5000 Log Board 34x45x5000mm QTY 2 LB34RG45 A 5000 Roof Board 16x121x2114mm QTY 90 MB16 C 2114 F...

Page 3: ...ered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain product label and instructions for future reference Felt Tacks x600 70...

Page 4: ...wing the same method arrange the remaining framing No 17 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws f...

Page 5: ...t level Ensure that the boards are level and flush with each other as you lay each one IMPORTANT Pre drill before fixing screws Step 4 Once you have laid 6 log boards off of the starter up the door se...

Page 6: ...e by 12 13 boards refer to door installation instructions if not you can install the door at step 7 Please Note The short boards placed to create the opening s for the doors windows can be placed eith...

Page 7: ...he door frame IMPORTANT Pre drill before fixing screws 3 3 Step 8 See Pre Assembly Parts needed No 5 QTY 1 No 10 QTY 1 No 12 QTY 1 No 13 QTY 1 Following the same method outlined in Pre Assembly lay th...

Page 8: ...11 IMPORTANT Pre drill before fixing screws IMPORTANT Pre drill before fixing screws Pre drill hole Step 11 Parts needed No 18 QTY 3 Align the Roof Purlin s No 18 into the cut out slots on each gable...

Page 9: ...he apex The last board on each side will overhang Using a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down boards back onto the r...

Page 10: ...ough each of the floor boards into the floor bearers 344x40mm Screws 40mm screw Pre drill hole Cut to fit Roof Closure Trim Internal 23 Measure and cut the closure trims to fit the internal space 23 2...

Page 11: ...per fascia making sure to screw through the fascia into the roof purlins and eaves frame Ensure the angled cuts meet at the top of the apex 24x40mm Screws Pre drill hole 40mm screw Pre drill hole 80mm...

Page 12: ...It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled P 12 Please retain product label and instructions for future reference...

Reviews: