
P 11
Please retain product label and instructions for future reference
Felt tacks
Step 17
Parts needed - No. 24
Cut the felt into five strips and lay
onto the roof in the order shown
in the illustration.
*Ensure there is approximately
50mm of overhanging felt each
side.
Once the felt is laid out fix to the
roof using felt tacks at 100mm
intervals.
Felt measurements:
1-5 = 1m x 4.6m
*Felt size: 4600mm
416x Felt Tacks
21
21
21
21
20
20
20
20
Step 18
Parts needed - No. 20 QTY 4
No. 21 QTY 4
Align the fascias (No. 20 & 21)
with the roof and fix into
place using 3x40mm
screws per fascia, making sure
to screw through the
fascia into the roof purlins
and eaves frame.
*Ensure the angled cuts meet
at the top of the apex.
24x40mm Screws
Pre drill
hole
40mm
screw
Pre drill
hole
80mm
bolt
Step 19
Parts needed - No. 22 QTY 8
Arrange the storm braces (No. 22)
around the building (internally ).
Place 2x storm braces per side
fixing into place using 2x 80mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each
bolt is tightened using a
washer so as not to damage
the log boards.
16x80mm Bolt Sets
1
2
5
3
4
HANDLE
WITH CARE
1
2
3
4
1.
2.
3.
4.
5.
22
22