It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
P 10
Please retain product label and instructions for future reference
Step 18
Parts needed - No. 16 QTY 4
Align the fascia’s
(No. 16)
with the roof and fix into
place using 3x40mm
screws per fascia, making
sure to screw through the
fascia into the roof purlins
and eaves frame.
*Ensure the angled cuts meet
at the top of the apex.
12x40mm Screws
Pre drill
hole
40mm
screw
Step 19
Parts needed - No. 20 QTY 8
Arrange the storm braces
(No. 20)
around the building
(internally)
.
Place 2x storm braces per side fixing
into place using 2x 70mm bolts per
brace making sure the washer & nut
are tightened from the outside of
the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***It is important that each bolt is
tightened using a washer so as not
to damage the log boards.
16x70mm Bolt Sets
Pre drill
hole
70mm
bolt
16
16
16
16
IMPORTANT :
Pre-drill before fixing screws.
IMPORTANT :
Pre-drill before fixing screws.
20
20