P 13
Please retain product label and instructions for future reference
Step 23
Parts Needed - No. 15 QTY 1
No. 21 QTY 2
Attach the Door Strip
(No. 15)
to the
back of the secondary door using
4x40mm screws as shown.
Once fixed, place the Tower
Bolts
(No. 21)
roughly into position
and with a pencil mark around the
bolt.
After marking the bolt onto
the frame, drill a hole for the barrel
bolt to locate into.
Following the hole being
drilled, place the tower bolts into
position and secure using the screws
provided.
12x40mm Screws
a
b
c
c
Pre drill
hole
40mm
screw
21
IMPORTANT :
Pre-drill before fixing screws.
15
b
a
32
Front
Side
Step 25
Parts neeeded - No. 32 QTY 44
Place the first floor board (
No. 32
) inside
the building flush to the log board on one
side. Continue adding the floor boards
(
internally
) making sure to interlock each
individual board.
You have been provided with 44 floor boards
however, you may only need to use 43.
*Do
NOT
secure the boards until the last
board has been measured and cut.
Following the same method as before
measure the gap between the bottom of
the tongue (
on the last board placed
) and
the log board.
Using a straight edge mark out the
measurement onto the last floor board
(No.
32)
and cut along the length removing the
excess.
**Please note:
Mark the final board 2mm
under the measurement; This will allow the
timber to expand and contract correctly.
Once all the floor boards are in position
secure each board into position using
8x40mm screws.
***Please Note:
Ensure to screw through
each of the floor boards into the floor bearers.
352x40mm Screws
40mm
screw
Pre drill
hole
*
Cut to fit
IMPORTANT:
Pre-drill before fixing screws.