background image

P 6

Please retain product label and instructions for future reference

             

9

Step 10

9x40mm Screws

Fit the fascias 

(No.8 and No.9)

 

to the roof over the felt and 

secure in place with 40mm 

screws as shown.

Pre drill to avoid splitting. 

40mm 

screw

Pre drill 

hole

8

Parts Needed- No.8 QTY 1, No.9 QTY 2

9

Step 11

30mm 

screw

Pre drill 

hole

11

Fix Pad Bolt 

(No.15)

 with 6x 30mm Screws 

to horizontal brace to the Right Hand 

Door.

Then fix the pad bolt retainer to the Left 

Hand Door framing using 4x30mm Screws

Fix the turn button 

(No. 14) 

 to the left 

hand door block ensuring the turn button 

catches the Plain Panel Front 

(No. 5) 

to 

secure the door.

15

14

11x30mm Screws

Parts Needed- No.11QTY 3

Attach a Door Block 

(No. 9) 

to the top 

of the secondary door 

(No.5)

 using 

2x30mm screws, in the positions 

illustrated. Screw through the door 

cladding into the blocks.

Attach the second and third Door 

Blocks (

No. 9)

 on top of the left and 

right doors top framing rail using 

2x30mm screws, in the position 

illustrated. Screw through the door 

cladding into the blocks.

6x30mm Screws

30mm 

screw

Pre drill 

hole

11

11

Step 12

Parts Needed- No.14 QTY 2, No.15 QTY 1

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

Reviews: