P 6
Please retain product label and instructions for future reference
9
Step 10
9x40mm Screws
Fit the fascias
(No.8 and No.9)
to the roof over the felt and
secure in place with 40mm
screws as shown.
Pre drill to avoid splitting.
40mm
screw
Pre drill
hole
8
Parts Needed- No.8 QTY 1, No.9 QTY 2
9
Step 11
30mm
screw
Pre drill
hole
11
Fix Pad Bolt
(No.15)
with 6x 30mm Screws
to horizontal brace to the Right Hand
Door.
Then fix the pad bolt retainer to the Left
Hand Door framing using 4x30mm Screws
Fix the turn button
(No. 14)
to the left
hand door block ensuring the turn button
catches the Plain Panel Front
(No. 5)
to
secure the door.
15
14
11x30mm Screws
Parts Needed- No.11QTY 3
Attach a Door Block
(No. 9)
to the top
of the secondary door
(No.5)
using
2x30mm screws, in the positions
illustrated. Screw through the door
cladding into the blocks.
Attach the second and third Door
Blocks (
No. 9)
on top of the left and
right doors top framing rail using
2x30mm screws, in the position
illustrated. Screw through the door
cladding into the blocks.
6x30mm Screws
30mm
screw
Pre drill
hole
11
11
Step 12
Parts Needed- No.14 QTY 2, No.15 QTY 1
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.