background image

P 1

04OCTGH0606-V3

Octagonal Greenhouse 6x6

 

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with Aquatan.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the 

correct application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a 

Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

Summary of Contents for 04OCTGH0606-V3

Page 1: ... conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as poss...

Page 2: ...tructions for future reference Before assembly please make sure you have a suitable base ready to erect your building MADE IN GREAT BRITAIN PI 07 0113 Hinge Buttermere roof trim 4318 1120mm Roof Trim 1120mm x8 S1295 757mm Fascia 757mm x8 F4444 573mm Shelf Support 573mm Corner Trim 1794mm Buttermere corner trim 4318 1107mm F4444 1800mm Shelf Support 1800mm F4444 1100mm BIRDMOUTH Rafters 1060mm x8 F...

Page 3: ...the Block No 21 with 2x30mm screws as shown 4x Window block per window Screw into the Window first 84x30mm screws Pre drill hole 30mm screw Step 2 To fix the Door No 3 into the Door panel No 2 Lay the Door panel flat on the ground and place the Door within the doorway The door can be hung from either side to suit your needs It is important that the door is placed central in the space provided Fix ...

Page 4: ...be able to be positioned until the roof is fitted and fixed 9x60mm screws Pre drill hole 60mm screw Step 6 The Shelf support No 12 is fixed to the panel framing with 2x60mm screws Fitting the shelf will allow for the building to be aligned The panels will still be able to be positioned until the roof is fitted and fixed 2x60mm screws Pre drill hole 60mm screw Step 7 Place the Shelf No 6 onto the S...

Page 5: ...align if not arranged as shown below 12x60mm screws Pre drill hole 60mm screw Step 10 For the Roof assembly construct the framing away from the building Use 4x50mm screws to secure the Roof Metal Plate No 27 to the Roof Boss No 25 4x50mm screws Fix the Roof rafters No 13 one at a time to the Boss Metal plate assembly as shown with 1x40mm screws per rafter 8x40mm screws Once all rafters are attache...

Page 6: ... to screw into panel framing Pre drilling is essential to avoid splitting 16x40mm screws Pre drill hole 40mm screw Step 13 Place the Roof panel No 5 onto the building and align the short edge so it is parallel to the door panel The tip of the panel must not protrude further than the Roof Boss Secure the Roof with 9x50mm screws Pre drilling is essential to avoid splitting 9x50mm screws Pre drill ho...

Page 7: ...he Roof plate No 14 with 1x50mm screw Fix the assembled Finial Roof plate to the building using 4x40mm screws 4x40mm screws 1x50mm screws Pre drill hole 40mm screw 50mm screw 15 14 Step 19 Fix each Corner Trim No 9 with 4x30mm screws making sure to screw into framing 32x30mm screws Pre drill hole 30mm screw Step 18 Secure each Fascia No 10 as shown with 3x30mm screws 24x30mm screws Pre drill hole ...

Page 8: ...drill hole first to avoid splitting On the inside of the door opening fix the ply triangle door stop No 17 to the bottom left corner using 3x20mm screws 7x20mm Screws Pre drill hole 20mm screw AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled 17 ...

Reviews: