50mm
screw
P 3
Please retain product label and instructions for future reference
Step 1
Parts needed -
Place the floor (No. 5) on a firm
and level base, ensure the base
has suitable drainage free from
areas where standing water can
collect.
(See front page on base
requirements).
Step 2
Parts needed - &
Place the Plain Panel (No. 2) and a
plain side (No. 3) onto the floor. Fix
together with 3x50mm screws as
shown in the diagram.
*Note: Do not screw to the floor at
this stage.
3x50mm screws
Step 3
Parts needed -
Place the other plain side (No. 3) onto
the floor and fix in the same way with
3x50mm screws.
*Note: Do not screw to the floor at
this stage.
3x50mm screws
Step 4
Parts needed -
Place the Door Gable (No. 1) onto
the assembly and fix with 3x50mm
screws on either end as shown.
*Note: Do not screw to the floor at
this stage.
3x50mm screws
1
1
3
2
5
3
3
3
2
Pre drill
hole
50mm
screw
Pre drill
hole
50mm
screw
Pre drill
hole
5
Pre Assembly
Remove the transportation blocks
from the bottom of each panel
before beginning the assembly.