background image

P 6

Step 12

Parts needed -            x4 

Place a corner strip (No. 12)  on all 

4 corners of the building as 

shown in the diagram and fix with 

3x30mm screws per strip.

12x30mm screws

Step 11

Fix the panels onto the floor in 

alignment with the floor bearers 

underneath.

Position the panels so there is 

equal spacing between the floor 

and cladding on all 4 sides.

Fix using 3x50mm screws per 

panel.

12x50mm screws

12

12

30mm 

screw

Step 13

Parts needed -            x2

 

Fix the fascia blocks (No. 14)  to the 

underside of the roof overhang as 

shown in the diargam. 

Screw down through the roof into 

the block using 2x30mm screws per 

block

4x30mm screws

14

12

14

Please retain product label and instructions for future reference

             

14

14

Pre drill 

hole

Pre drill 

hole

50mm 

screw

30mm 

screw

Pre drill 

hole

12

Summary of Contents for 03OVLPBRN0705-V3

Page 1: ...rain or snow Our buildings are pre treated with a water based treatment this only helps to protect the product during transit and for up to 3 months against mould To validate your guarantee and ensure...

Page 2: ...21 22 35mm Bolt x4 Nail Bag 50mm Screw x 22 Felt Tacks x 80 30mm Screw x 120 10mm Screw x 12 30mm Black Screw x 2 Corner Brace QTY 2 PI 07 0012 Finial QTY 2 SHED DIAMOND FINIAL Chrome Handle QTY 2 PI...

Page 3: ...diagram Note Do not screw to the floor at this stage 3x50mm screws Step 3 Parts needed Place the other plain side No 3 onto the floor and fix in the same way with 3x50mm screws Note Do not screw to th...

Page 4: ...w 7 Step 5 Parts needed x2 2 x8 To fix the Windows into the panels that accomodate a window Position the Window No 4 central into the window opening Fix the Window Block No 22 to the Window central as...

Page 5: ...Roof Sheet No 8 as shown in the image Ensure to screw through the roof into the eave fix using 4x30mm screws per eave Repeat with the other roof sheet 8x30mm screws Step 8 Parts needed x2 To attach t...

Page 6: ...s equal spacing between the floor and cladding on all 4 sides Fix using 3x50mm screws per panel 12x50mm screws 12 12 30mm screw Step 13 Parts needed x2 Fix the fascia blocks No 14 to the underside of...

Page 7: ...roof as shown in the diagram ensuring there is a 50mm overhang around the sides Fix using felt tacks at 100mm intervals 80 Felt Tacks Step 15 Parts needed x4 Attach the fascias No 11 to the front and...

Page 8: ...l bolt No 18 to the top and bottom of the slave door as shown in diagram Use 4x10mm screws per barrel bolt Drill a hole in the framing above and below the door for the barrel bolt to fix into 12x10mm...

Reviews: