background image

Step 2

Step 3

Step 4

30mm 

screw

Place the plain gable and one 

plain side onto the floor and 

secure together using 

3x50mm screws.

3x50mm Screws

2

P 3

Please retain product label and instructions for future reference

             

Fix the T-Hinges to the door 

using 7x30mm screws per 

hinge. Ensure to line the 

screws with the framing.

21x30mm Screws

30mm 

screw

Pre drill 

hole

b

c

b

Attach the bolt block 

to the inside of the 

door, line the block 

with the end of the 

centre framing and 

secure using 

2x30mm screws.

2x30mm Screws

30mm 

screw

Pre drill 

hole

c

Fix the pad bolt to the 

door using 10x30mm 

black screws. 

Ensure to align the pad 

bolt with the door’s 

framing and the bolt 

block.

10x30mm Black Screws

Pre drill 

hole

13

10

12

6

1

50mm 

screw

Pre drill 

hole

b

b

b

b

2

3

b

Do not secure the building 

to the floor until the roof is 

fitted.

Fix the door gable and the 

second plain side using the 

method outlined above in step 3.

9x50mm Screws

50mm 

screw

Pre drill 

hole

1

Reviews: