background image

P 3

Please retain product label and instructions for future reference

      

27

Building Content - 10X8 Pack B With Window  :

With WIndow Pack - 01OVLPA0508FWPB-V1 

Plain Side QTY 2

AI-01OVLPPS1490X1567-V2

Window Panel QTY 2

AI-01OVLPWS1490X1567-V2

Floor QTY 2

AI-01OVLPF2360X1487-V2

Roof QTY 8

PI-03-0224

28

Ridge Bar - 27x70x1462mm QTY 2

F2770-1462mm

Truss Frame - 27x44x1262mm QTY 4

F2744-G-1302mm (1262mm finished length)

Truss Block - 27x44x140mm QTY 4

F2744-G-160mm (140mm finished length)

Truss Support - 27x44x450mm QTY 2

F2744-G-490mm (450mm finished length) 

29

Strip - 12x27x2000 QTY 2 

S1227-2500mm

Plastic Window Cill

QTY 2 

PI-08-0013

Styrene QTY 4

PI-05-0114

32

U Channel QTY 1

PI-07-0013

Strip - 12x45x1585mm QTY 4

S1245-1585mm

33

34

30

Strip - 12x27x1500 QTY 2 

S1227-1000mm

31

Eaves Frame - 28x28x751mm QTY 8

F2828-751mm

14

7

8

9

26

25

24

27

Building Content - 10X8 Pack C No Window :

No WIndow Pack - 01OVLPA0508NWPC-V1

Plain Side QTY 4

AI-01OVLPPS1490X1567-V2

Floor QTY 2

AI-01OVLPF2360X1487-V2

Roof QTY 8

PI-03-0224

28

Ridge Bar - 27x70x1462mm QTY 2

F2770-1462mm

Truss Frame - 27x44x1262mm QTY 4

F2744-G-1302mm (1262mm finished length)

Truss Block - 27x44x140mm QTY 4

F2744-G-160mm (140mm finished length)

Truss Support - 27x44x450mm QTY 2

F2744-G-490mm (450mm finished length) 

U Channel QTY 1

PI-07-0013

Strip - 12x45x1585mm QTY 4

S1245-1585mm

33

31

Eaves Frame - 28x28x751mm QTY 8

F2828-751mm

14

7

8

9

26

24

Contents for packs to create a 10x8 shed

Nail Bag

30mm Screw x 48

50mm Screw x 58

40mm Screw x 136

Nail Bag

30mm Screw x 48

50mm Screw x 58

40mm Screw x 136

Summary of Contents for 01OVLPA08DDGP-V1

Page 1: ...g rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required t...

Page 2: ...SHED FINIAL 18 17 Turn Button QTY 3 PI 07 0034 23 Back Gable Right QTY 1 AI 01OVLPHPGR1155X2089 V1 Front Gable Right QTY 1 AI 01OVLPFGR713X1897 V1 Front Gable Top QTY 1 AI 01OVLPFGT884X439 V1 Door Fra...

Page 3: ...07 0013 Strip 12x45x1585mm QTY 4 S1245 1585mm 33 34 30 Strip 12x27x1500 QTY 2 S1227 1000mm 31 Eaves Frame 28x28x751mm QTY 8 F2828 751mm 14 7 8 9 26 25 24 27 Building Content 10X8 Pack C No Window No...

Page 4: ...G 490mm 450mm finished length 29 Strip 12x27x2000 QTY 2 S1227 2500mm Strip 12x45x1585mm QTY 4 S1245 1585mm 30 Strip 12x27x1500 QTY 2 S1227 1000mm 14 7 8 9 Plain Side QTY 4 AI 01OVLPPS1763X1567 V2 Floo...

Page 5: ...ure to stagger the screws so they do not collide 2 x 50mm screws IMPORTANT Pre drill before fixing screws 2 50mm screw Pre drill hole Step 2 Parts Needed No 2 QTY 1 Lay the Front Gable Left No 2 next...

Page 6: ...le Step 5 Parts Needed 10x8 No 26 QTY 2 Parts Needed 12x8 No 37 QTY 4 No 40 QTY 8 Place the floors No 26 or 37 on firm and level base ensure the base has suitable drainage free from areas where water...

Page 7: ...ng into the corner using 50mm screws 3 x 50mm screws 4 5 24 10 x 8 12 x 8 35 4 5 50mm screw Pre drill hole Step 7 Parts Needed 10x8 No 24 QTY 1 No Window QTY 2 No 25 QTY 1 Fixed Window only Parts Need...

Page 8: ...anel so there is equal spacing between the floor and cladding on each side 3 x 50mm screws 25 10 x 8 12 x 8 36 1 2 3 50mm screw Pre drill hole Step 9 Fix the Door Gable please refer to steps 1 and 2 i...

Page 9: ...No 22 QTY 2 No 28 QTY 2 No 33 QTY 1 Parts Needed 12x8 No 22 QTY 2 No 33 QTY 1 No 41 QTY 2 Position the two Ridge Bars No 28 or 41 within the U channel No 33 Secure from either side with 3x30mm screws...

Page 10: ...the first Truss Repeat this method to fit 6 roof truss frames to the shed 6 x 50mm screws IMPORTANT Pre drill before fixing screws 7 7 7 7 7 50mm screw Pre drill hole IMPORTANT Pre drill before fixin...

Page 11: ...10x8 No 27 QTY 8 Parts Needed 12x8 No 38 QTY 4 Place one Roof Sheet No 27 or 38 on either side of the Shed Position on top of the back gable and truss frame No 7 making sure the roof sheet sits flush...

Page 12: ...f the Roof sheets on either side of the Shed ensuring they are flush to the end Fix to the roof sheet using 3x30mm screws for each eaves frame 10 x 8 24 x 40mm screws 12 x 8 12 x 40mm screws 30mm scre...

Page 13: ...felt tacks spaced 100mm apart 190 x Felt Tacks IMPORTANT Pre drill before fixing screws 1 2 3 Felt tacks 14 14 14 14 14 14 40mm screw Pre drill hole Step 20 Parts Needed No 14 QTY 6 Using a pencil and...

Page 14: ...IMPORTANT Pre drill before fixing screws 13 40mm screw Pre drill hole Step 22 Parts Needed No 15 QTY 1 Using a pencil and a straight edge measure the Strip No 15 to create two 237mm length strips Cut...

Page 15: ...IMPORTANT Pre drill before fixing screws trim to fit a c b a 30mm screw Pre drill hole Step 24 Parts Needed No 10 QTY 2 No 16 QTY 2 No 23 QTY 2 Place the door blocks No 10 on top of the internal frami...

Page 16: ...hand door using 30mm screws Locate the remaining turn button No 23 onto the master door and secure using 1x30mm crew 6 x 30mm Screws a a b 11 11 30mm screw Pre drill hole IMPORTANT Pre drill before f...

Page 17: ...Cladding Side View Step 28 Fixed Window only Parts Needed No 29 QTY 1 No 30 QTY 2 Using a pencil and a straight edge measure the Strips No 29 30 to create Six 546mm length strips Cut along the marked...

Page 18: ...2 1 3 4...

Page 19: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2...

Reviews: