background image

P 1

01OVLPA0305SDNW-V1

3x5 Overlap Apex Shed

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, wood saw, step ladder and drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for you specific product code

Summary of Contents for 01OVLPA0305SDNW-V1

Page 1: ...conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possi...

Page 2: ... AI 01OVLPDG1410X1894 V1 Plain Side QTY 2 AI 01OVLPPS800X1567 V1 Plain Gable AI 01OVLPPG1410X1894 V1 Floor AI 01OSBF1460X795 V1 Roof QTY 2 PI 03 0331 Door AI 01MBDR1660X663 V1 Ridge Bar 28x28x744mm F2828 744mm Eave Frame 28x28x835mm QTY 2 F2828 835mm Fascia 12x60x851mm QTY 4 S1260 851mm Door Strip 12x28x1590mm QTY 2 S1228 1590mm Cover Trim 12x45x1560mm QTY 4 S1245 1560mm Finial QTY 2 Shed Diamond ...

Page 3: ...oor until the roof has been fitted 3x50mm Screws a b a a a a a a a a a b b b 50mm screw Pre drill hole Step 4 Rest the assembled door gable No 1 and the second plain side No 2 onto the floor Ensure the door gable sits inside the plain sides Fix the panels at the corner using 9x 50mm screws Do NOT secure the building to the floor until the roof has been fitted 9x50mm Screws a b 2 1 14 7 a b Step 5 ...

Page 4: ...30mm screws Fix the the assemble roof sheets onto the gables securing each sheet with 8x30mm screws 22x30mm Screws b b b b b b Step 7 Once the roof has been fixed into position secure the building to the floor using 12x50mm screws Ensure to align the screws with the floor bearers 12x50mm Screws b Step 8 Cut the felt into 1 sheet and lay onto the roof allowing approximately 50mm of overhang arond t...

Page 5: ...ep 10 Attach the fascia s No 9 and finial s No 12 to the front and back of the building as shown in the illustration using 12x30mm screws Ensure to trap the felt between the fascia s and the building 12x30mm Screws 10 10 10 Step 11 Secure the door strips No 10 to the inside of the door gable fixing each strip into place with 4x 30mm screws 8x30mm Screws Step 12 Attach the turn buttons No 15 to the...

Page 6: ... that you apply wood treatment immediately after the building has been assembled P 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference ...

Reviews: