background image

11

11

11

11

30mm 

screw

Pre drill 

hole

9

12

9

9

9

12

30mm 

screw

Pre drill 

hole

30mm 

screw

Pre drill 

hole

Pre drill 

hole

30mm 

screw

P 5

Please retain product label and instructions for future reference

             

Step 9

Fix the cover trims (

No. 11

) to 

the corners of the building, 

securing each trim using 

3x30mm screws.

12x30mm Screws

Step 10

Attach the fascia’s (

No. 9

) and finial’s (

No. 12

)

to the front and back of the building as 

shown in the illustration, using 12x30mm

screws.

*Ensure to trap the felt between the fascia’s

and the building.

12x30mm Screws

10

10

10

Step 11

Secure the door strips (

No. 10

) to the inside of

the door gable, fixing each strip into place

with 4x 30mm screws.

8x30mm Screws

Step 12

Attach the turn buttons (No. 15) to the

door gable as shown in the illustration,

fixing each turn button into place using

2x 30mm black screws.

2x30mm Black Screws

Summary of Contents for 01OVLPA0305SDNW-V1

Page 1: ...conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possi...

Page 2: ... AI 01OVLPDG1410X1894 V1 Plain Side QTY 2 AI 01OVLPPS800X1567 V1 Plain Gable AI 01OVLPPG1410X1894 V1 Floor AI 01OSBF1460X795 V1 Roof QTY 2 PI 03 0331 Door AI 01MBDR1660X663 V1 Ridge Bar 28x28x744mm F2828 744mm Eave Frame 28x28x835mm QTY 2 F2828 835mm Fascia 12x60x851mm QTY 4 S1260 851mm Door Strip 12x28x1590mm QTY 2 S1228 1590mm Cover Trim 12x45x1560mm QTY 4 S1245 1560mm Finial QTY 2 Shed Diamond ...

Page 3: ...oor until the roof has been fitted 3x50mm Screws a b a a a a a a a a a b b b 50mm screw Pre drill hole Step 4 Rest the assembled door gable No 1 and the second plain side No 2 onto the floor Ensure the door gable sits inside the plain sides Fix the panels at the corner using 9x 50mm screws Do NOT secure the building to the floor until the roof has been fitted 9x50mm Screws a b 2 1 14 7 a b Step 5 ...

Page 4: ...30mm screws Fix the the assemble roof sheets onto the gables securing each sheet with 8x30mm screws 22x30mm Screws b b b b b b Step 7 Once the roof has been fixed into position secure the building to the floor using 12x50mm screws Ensure to align the screws with the floor bearers 12x50mm Screws b Step 8 Cut the felt into 1 sheet and lay onto the roof allowing approximately 50mm of overhang arond t...

Page 5: ...ep 10 Attach the fascia s No 9 and finial s No 12 to the front and back of the building as shown in the illustration using 12x30mm screws Ensure to trap the felt between the fascia s and the building 12x30mm Screws 10 10 10 Step 11 Secure the door strips No 10 to the inside of the door gable fixing each strip into place with 4x 30mm screws 8x30mm Screws Step 12 Attach the turn buttons No 15 to the...

Page 6: ... that you apply wood treatment immediately after the building has been assembled P 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference ...

Reviews: