P 4

Please retain product label and instructions for future reference

             

Step 3

Parts needed - No. 2, (or  1, or 3, or 8)  QTY 1

                                 No. 3 (or 8) QTY 1

                                 

**Please note:  The side panels are all 

interchangeable and can be posititioned in

a variety of configurations.  Decide which 

works best before assembly.  See Page 2 for 

suggested options.**

Fix the corners of the Plain panel 2 

(No. 3)

 

and a Plain Panel 1 

(No. 2)

 (or panel 

of your choice) with 50mm screws as shown 

in diagram.

 

Do not secure the building to the floor until the

roof has been fitted,

Position the panels so there is equal spacing 

between the floor and cladding on all sides.  

3x50mm Screws

50mm 

screw

Pre drill 

hole

3

2

Step 4

Parts needed - No. 2, (or  1, or 3, or 8) QTY 1

                                 No. 3, (or  1, or 8) QTY 1

Fix the corners of the Plain panel 1

(No. 2)

(or panel of your choice) and the Plain panel 2 

with 50mm screws as shown in diagram.

 

Fix the end of the Plain Panel 2 

(No. 3)

 (or 

panel of your choice) to the already standing chosen 

panel with 50mm screws as shown in diagram.

Do not secure the building to the floor until the

roof has been fitted,

Position the panels so there is equal spacing 

between the floor and cladding on all sides.  

6x50mm Screws

50mm 

screw

Pre drill 

hole

3

2

Step 5

Parts needed - No. 8  QTY 1

  

Fix the end of the Window Panel 

(No. 8)

 (or 

panel of your choice) to the already standing

chosen panel with 50mm screws as shown in 

diagram. 

Do not secure the building to the floor until 

the roof has been fitted,

Position the panels so there is equal spacing 

between the floor and cladding on all sides.  

3x50mm Screws

50mm 

screw

Pre drill 

hole

8

1

Step 6

Parts needed - No. 1, (or 3, or 8) QTY 1

Fix the corners of the Door Panel 

(No. 1) 

(or panel of your choice) to the  

plain panels 

(No. 2 or 3) 

with 50mm 

screws as shown in diagram.

 

Do not secure the building to the 

floor until the roof has been fitted,

Position the panels so there is equal 

spacing between the floor and 

cladding on all sides.  

6x50mm Screws

50mm 

screw

Pre drill 

hole

Summary of Contents for 01DTSHRAX0604SDFW-V1

Page 1: ...id placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions...

Page 2: ...Door Panel QTY 1 AI 01S11SHSD1180X1802 V1 Plain Panel 1 QTY 2 AI S11SHPPTF524X1802 V1 Plain Panel 2 QTY 2 AI S11SHPPTF1180X1802 V1 Door QTY 1 AI S11FBMBZBD743X1680 V1 Roof QTY 2 AI S11MBOHAR712X1790 V...

Page 3: ...an collect See front page for base requirements 6 Step 2 Parts needed No 1 QTY 1 No 4 QTY 1 No 19 QTY 3 Place the door No 4 within the Door Panel No 1 Fix the T Hinges No 19 onto the door and Door Pan...

Page 4: ...n Panel 2 No 3 or panel of your choice to the already standing chosen panel with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the pan...

Page 5: ...TY 2 Place the Roof Panels No 5 on top of the building making sure the framing in the roof panels sits firmly within the Gable Tops No 7 and on top of the Ridge Bar No 13 Make sure that you have got t...

Page 6: ...e is an equal distance on all sides Attach 1x Outer Window Strip No 16 along the top of the window opening Followed by attaching 3x Outer Window Strips No 15 to either side of the windows and the cent...

Page 7: ...P 7 Please retain product label and instructions for future reference Felt tacks Step 13 Parts needed No 22 QTY 1 Cut the felt No 22 into two sheets at 1900mm Lay onto roof as shown in diagram ensuri...

Page 8: ...cks using 30mm screws 2x30mm Screws Step 16 Parts needed No 9 QTY 2 No 11 QTY 1 30mm screw 30mm screw Pre drill hole Pre drill hole Step 17 Parts needed No 20 QTY 1 Screw the Pad Bolt No 20 on to the...

Page 9: ...and instructions for future reference P 9 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Page 10: ...2 1 3 4...

Page 11: ...1 2...