background image

P 5

Please retain product label and instructions for future reference

             

Step 7

Parts needed - No. 7 QTY 2

Place the Gable Tops 

(No. 7)

 central over the 

end panels.  Make sure that the cladding 

slots together and fix into position using 

50mm screws.

Fix together using 8x50mm screws 

staggering the screws so they don’t collide.

8x50mm Screws

   

50mm 

screw

Pre drill 

hole

7

7

Step 8

Parts needed - No. 13 QTY 1

                                 No. 18 QTY 2

Place the ridge bar 

(No. 13)

 in between the 

Gable Tops 

(No. 7) 

in line with the central 

framing of the gable tops.  

Fix the ridge bar to the gable using one 

L bracket 

(No. 18)

 for each end.  Fix with 

4x20mm screws each. 

8x20mm Screws

20mm 

screw

Pre drill 

hole

13

18

Step 9

Parts needed - No. 5 QTY 2

Place the Roof Panels 

(No. 5)

 on top of the 

building making sure the framing in the roof 

panels sits firmly within the Gable Tops 

(No. 7)

  

and on top of the Ridge Bar 

(No. 13)

.  

**Make sure that you have got the roof panels 

the correct way round with the recess at the top 

of the apex as shown in the diagram.**

**The edges of the roof panels must be flush 

with the outer cladding of the Gable Tops 

(No. 7).** 

From the top, fix directly through the roof panels 

(No. 5) 

and into the ridge bar 

(No. 13) 

below 

using 5x60mm screws per roof panel .

It is essential that the ridge bar 

(No. 13) 

and roof 

panel 

(No. 5) 

framing pull together when fixed 

with 60mm screws.  You may require another person 

pushing the ridge bar 

(No. 13) 

up from below to 

achieve this.

HINT - Follow the nailing line of the framing on 

the roof panel so that you are more likely to

fix into the ridge bar below. 

10x60mm Screws

60mm 

screw

Pre drill 

hole

5

5

Summary of Contents for 01DTSHRAX0604SDFW-V1

Page 1: ...id placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions...

Page 2: ...Door Panel QTY 1 AI 01S11SHSD1180X1802 V1 Plain Panel 1 QTY 2 AI S11SHPPTF524X1802 V1 Plain Panel 2 QTY 2 AI S11SHPPTF1180X1802 V1 Door QTY 1 AI S11FBMBZBD743X1680 V1 Roof QTY 2 AI S11MBOHAR712X1790 V...

Page 3: ...an collect See front page for base requirements 6 Step 2 Parts needed No 1 QTY 1 No 4 QTY 1 No 19 QTY 3 Place the door No 4 within the Door Panel No 1 Fix the T Hinges No 19 onto the door and Door Pan...

Page 4: ...n Panel 2 No 3 or panel of your choice to the already standing chosen panel with 50mm screws as shown in diagram Do not secure the building to the floor until the roof has been fitted Position the pan...

Page 5: ...TY 2 Place the Roof Panels No 5 on top of the building making sure the framing in the roof panels sits firmly within the Gable Tops No 7 and on top of the Ridge Bar No 13 Make sure that you have got t...

Page 6: ...e is an equal distance on all sides Attach 1x Outer Window Strip No 16 along the top of the window opening Followed by attaching 3x Outer Window Strips No 15 to either side of the windows and the cent...

Page 7: ...P 7 Please retain product label and instructions for future reference Felt tacks Step 13 Parts needed No 22 QTY 1 Cut the felt No 22 into two sheets at 1900mm Lay onto roof as shown in diagram ensuri...

Page 8: ...cks using 30mm screws 2x30mm Screws Step 16 Parts needed No 9 QTY 2 No 11 QTY 1 30mm screw 30mm screw Pre drill hole Pre drill hole Step 17 Parts needed No 20 QTY 1 Screw the Pad Bolt No 20 on to the...

Page 9: ...and instructions for future reference P 9 It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and...

Page 10: ...2 1 3 4...

Page 11: ...1 2...

Reviews: