Please retain product label and instructions for future reference
Step 12
27
10X10
30mm
screw
Pre drill
hole
7
7
NOT ALL SIZE OPTIONS ARE SHOWN BELOW,
THE ILLUSTRATIONS ARE EXAMPLES.
Parts needed
QTY 2
10x10
12x10
14x10
15x10
16x10
18x10
20x10
QTY 10
QTY 2
QTY 20
QTY 2
QTY 30
QTY 2
QTY 20
QTY 2
QTY 40
QTY 2
QTY 50
QTY 2
QTY 30
No.7
No.27
30mm Screw
QTY 1
QTY 2
QTY 3
QTY 2
QTY 4
QTY 5
QTY 3
No.38
QTY 1
QTY 2
QTY 3
QTY 4
No.37
QTY 1
QTY 2
Place the roof panels
(No. 7, No. 37 & No.
38)
ontop of the building and truss
making sure the roof panels sit into the
gables and truss. Do not fix the roof panels
until all roof panels are in place.
Ensure there is an equal amount of roof
overhang on either side of the building.
Secure the roof panels
(No. 7, No. 37 & No.
38)
together using the metal U channel
(No.
32)
and 10x30mm screws per U channel.
7
37
7
37
37
7
7
37
7
7
20X10
16X10
12X10
38
38
Building Size
P 21
Ensure there is an equal amount of roof
overhang on either side of the building.
Fix the Roof using 40mm screws, ensuring
to fix into the truss framing and gable tops.
Parts needed
10x10
12x10
14x10
15x10
16x10
18x10
20x10
QTY 32
QTY 48
QTY 64
QTY 48
QTY 80
QTY 96
QTY 64
40mm Screw
Step 13
40mm
screw
Pre drill
hole
NOT ALL SIZE OPTIONS ARE SHOWN
BELOW, THE ILLUSTRATIONS ARE
EXAMPLES.
10X10
20X10
16X10
12X10
Building Size
Summary of Contents for 01DTPRMSHAX1010DDOP-V1
Page 28: ... 2 1 3 4 ...
Page 29: ... 1 2 ...