P 8
Please retain product label and instructions for future reference
Lay the Gable tops
(No.8 and No.9)
along side each other as show in the
diagram, secure together using 4x50mm
screws in an alternating pattern
Secure the Gable support
(No.18)
to the
gable tops, ensuring it sits flush with the
framing, secure using 6x50mm screws
going through the support and into the
gable framing behind.
Finally secure Gable Point
(No.23)
to the
top of the gables, secure using 4x30mm
screws going through the cladding and
into the gable framing
Repeat Step to create two assembled
gables
Step 16
Fix the Casement Stay
(No. 26)
to
the opening window then align
the fixings onto the window panel
frame.
Ensure the casement stay fits into
fixings when closed before screw-
ing them down using 6x16mm
screws per casement stay.
26
Parts needed
QTY 2
10x10
12x10
14x10
15x10
16x10
18x10
20x10
QTY 2
QTY 2
QTY 3
QTY 2
QTY 2
QTY 3
No.26
16mm Screws
QTY 12
QTY 12
QTY 12
QTY 18
QTY 12
QTY 12
QTY 18
Building Size
16mm
screw
Pre drill
hole
P 12
Step 17
Parts needed
QTY 2
10x10
12x10
14x10
15x10
16x10
18x10
20x10
QTY 2
QTY 2
QTY 2
QTY 2
QTY 2
QTY 3
No.6
No.28
QTY 6
QTY 6
QTY 6
QTY 6
QTY 6
QTY 6
QTY 9
QTY 63
30mm Screw
QTY 42
QTY 42
QTY 42
QTY 42
QTY 42
QTY 42
Fix the T Hinges
(No. 28)
onto the doors
(No. 6)
as shown using 7x30mm screws
per T hinge.
Ensure that the screws go through the
cladding and into the framing behind.
If you have purchased a 20x10, repeat
this step when attaching the single
door.
20X10
10X10
28
28
28
28
28
28
28
28
28
28
28
30mm
screw
Pre drill
hole
6
6
6
6
6
Building Size
Summary of Contents for 01DTPRMSHAX1010DDOP-V1
Page 28: ... 2 1 3 4 ...
Page 29: ... 1 2 ...