background image

11

10

Step 10

Place the shortest roof support bar

at the front of the building, align

with the framing on the door panel

and secure to the door panel and

the roof support bar with 3x 

“L” brackets & 12x30mm screws.

Ensure the roof support bar is level 

with the top of the building.

Following the same method outlined

in step 9, fix the remaining roof

support block to the rear of the building

making sure that the last roof support

bar sits level with the panels. Secure to

the centre support with 2x”L” brackets

and 8x30mm screws.

2x80mm Screws

20x30mm Screws 

30mm 

screw

Pre drill 

hole

80mm 

screw

Step 11

Layout the roof sheet and position

the eaves frames around the edge

as shown in the illustration.

Ensure the framing is flush to the

edge of the sheet and fix into

each eaves frame into place using

30mm screws.

17x30mm Screws 

30mm 

screw

Pre drill 

hole

Step 12

Place the assembled roof section onto

the building, esuring the framing slots

over each side.

Secure into place using 21x40mm

screws making sure to align the

screws with the vertical framing and

along the roof support bar.

*It is recommended to cut the felt

sheets using the roof as a template

before fixing into place.

21x40mm Screws 

40mm 

screw

Pre drill 

hole

Step 12

 

Secure the building to the floor

 

using 20x50mm screws, ensuring

 

to screw through the panel into

 

the floor bearers.

20x50mm Screws 

50mm 

screw

Pre drill 

hole

P 5

Please retain product label and instructions for future reference

             

Roof support must be 

level with top of framing

12

28

28

Rear roof framing

Rear roof framing

Side roof framing

Side roof framing

Front roof framing

Summary of Contents for 01COR0707-V1

Page 1: ...must be taken to ensure the product is placed on a suitable base BUILDING A BASE When thinking about where the building and base is going to be constructed Ensure that there will be access to all sides for maintenance work and annual treatment Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level we can...

Page 2: ...ect your building MADE IN GREAT BRITAIN Door Panel Window Panel Plain Panel Rear Panel Right Rear Panel Left Floor Roof Sheet Door QTY 2 Roof Support Bar 2650mm Roof Support Bar 1303mm Roof Support Bar 763mm Roof Support Block 210mm QTY 3 Door Block 140mm QTY 2 Eaves Frame 2049mm Eaves Frame 2025mm Eaves Frame 1149mm Qty 2 Eaves Frame 1196mm Fascia 2045mm QTY 2 Fascia 1202mm QTY 2 Fascia 1213mm Co...

Page 3: ... Step 4 Place the plain window panel onto the floor Secure the plain panel and the window panel to the rear panels using 3x50mm screws The window and plain panels can be placed either side of the building Do NOT screw the building to the floor until the roof is fitted 6x50mm Screws Pre drill hole 50mm screw 1 8 8 26 Step 5 Secure the doors to the door panel using 2x T hinges per door fixing into p...

Page 4: ...lack Screw 30mm screw 30mm screw Pre drill hole 12 9 Step 8 Place the door panel onto the floor Secure the panel to the the window plain panel using 6x50mm screws Do NOT screw the building to the floor until the roof is fitted 6x50mm Screws 50mm screw Pre drill hole Roof support must be level with top of framing Step 9 Position the larger roof support bar in the centre of the building between the ...

Page 5: ...nsure the framing is flush to the edge of the sheet and fix into each eaves frame into place using 30mm screws 17x30mm Screws 30mm screw Pre drill hole Step 12 Place the assembled roof section onto the building esuring the framing slots over each side Secure into place using 21x40mm screws making sure to align the screws with the vertical framing and along the roof support bar It is recommended to...

Page 6: ...ound the building see dotted line 80x Felt Tacks Felt tacks HANDLE WITH CARE 1 2 3 4 Step 15 Fix the cover trims to the building using 3x30mm screws per trim 12x30mm screws 30mm screw Pre drill hole Step 16 Fix the cover trims to the building using 3x30mm screws per trim 6x30mm screws 30mm screw Pre drill hole P 6 Please retain product label and instructions for future reference 22 22 22 22 1 2 3 ...

Page 7: ...17x40mm screws 40mm screw Pre drill hole It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled AFTER TREATMENT score around protective cover on glazing and carefuly peel covering back Please retain product label and instructions for future reference ...

Reviews: