Flat tire
371
Version 1
1
Flap
2
Air pump switch
3
Electrical plug
4
Air hose with pressure gauge and vent
screw
5
Union nut
Version 2
2
Air pump switch
3
Electrical plug
4
Pressure gauge
5
Union nut
6
Deflate button
X
Version 1 only: Open flap
1
on electric
air pump.
X
Version 1 only: Pull out electrical plug
3
and air hose with pressure gauge
4
.
X
Version 2 only: Pull electrical plug
3
and
the air hose out of the pump housing
bottom.
X
Version 1 only: Close vent screw on air
hose
4
.
X
Remove the valve cap from the collapsible
tire valve.
X
Screw union nut
5
onto the collapsible tire
valve.
X
Make sure air pump switch
2
is set to
0.
X
Insert electrical plug
3
into the power
outlet in the second-row footwell
(
Y
page 229).
!
The cigarette lighter as well as the power
outlets in the passenger footwell and cargo
compartment are not designed for use with
the electric air pump. Use the power outlet
in the second-row footwell for electric air
pump operation.
X
Turn the SmartKey in the starter switch to
position
1.
or
X
Vehicles with KEYLESS-GO: Press the
KEYLESS-GO start/stop button once. Do
not depress the brake pedal.
Practical hints
Z
Summary of Contents for 2009 R-Class
Page 1: ...R Class Operator s Manual ...
Page 28: ...Exterior view 26 Exterior view At a glance ...
Page 30: ...Cockpit 28 Cockpit At a glance ...
Page 32: ...Instrument cluster 30 Instrument cluster At a glance ...
Page 34: ...Instrument cluster 32 At a glance ...
Page 36: ...Storage compartments 34 Storage compartments At a glance ...
Page 44: ...42 ...
Page 84: ...82 ...
Page 149: ...Control system 147 Menus and submenus Controls in detail Z ...
Page 244: ...242 ...
Page 300: ...298 ...
Page 390: ...388 ...
Page 401: ...Weights 399 Weights Model All models Roof load max 220 lb 100 kg Technical data Z ...
Page 410: ...408 ...
Page 412: ...Order no 6515 1823 13 Part no 251 584 08 82 Edition A 2009 É2515840882 ËÍ 2515840882 ...