DISASSEMBLY INSTRUCTIONS
B2-2
Lever Switch
Fig. 2-4-C
Rack Loading
A
B
The Lever should be position
between A and B.
2-5:
Remove the Traverse Holder.
Remove the 2 Insulator (F).
1.
2.
Fig. 2-5-A
Traverse Holder
TRAVERSE HOLDER/INSULATOR (F)
(Refer to Fig. 2-5-A)
Insulator (F)
(Black)
Main Chassis Ass'y
NOTE
1. After the installing of the Traverse Holder, check if the
wire is like Fig. 2-5-B.
Insulator (F)
(Black)
Fig. 2-4-D
NOTE
1.
2.
3.
4.
When installing the Clamper Magnet, install it with the
green face up.
When installing the wire of the Lever Switch, install it
correctly as Fig. 2-4-B.
When installing the Lever Switch, install it correctly as
Fig. 2-4-C.
In case of the Lever Switch installation, hook the wire
on the Main Frame as shown Fig. 2-4-D.
Fig. 2-4-B
Lever Switch
Red
White
Blue
From DVD PCB
2-7: RACK FEED ASS'Y (Refer to Fig. 2-7-A)
Remove the screw
1
.
Remove the Rack Feed 1A Spring, Rack Feed 1A/2A
and Rack Feed Lever.
1.
2.
1
Rack Feed 1A
Rack Feed Lever
Rack Feed 2A
Rack Feed 1A Spring
Fig. 2-7-A
Main Chassis Ass'y
• Screw Torque: 3.5
±
0.5kgf•cm
2-6: SWITCH PCB ASS'Y (Refer to Fig. 2-6-A)
Remove the screw
1
.
Remove the Switch PCB Ass'y.
1.
2.
NOTE
1. When installing the wire of the Switch PCB, install it
correctly as Fig. 2-6-B.
Fig. 2-6-B
Switch PCB Ass'y
Black
White
From Relay PCB
Fig. 2-6-A
Switch PCB Ass'y
1
Main Chassis Ass'y
• Screw Torque: 4
±
0.5kgf•cm
Fig. 2-5-B
Traverse Holder
Main Chassis Ass'y
Summary of Contents for MVD2113
Page 60: ...M5K3 15V K455003 SPEC NO O R NO...
Page 116: ...M5P2 05V K465024 SPEC NO O R NO...